SITE CLEARANCE ETC. 1 Allow for clearing the area of the site to be built upon of all grass, weeds, shrubs, trees with trunks not exceeding 200mm girth, debris, etc., including grubbing up all roots, scoffling up as required and cart away all vegetation and debris. m2 9 2 Stripping average 300mm thick layer of topsoil and stockpiling on site. m2 9 Excavate in pickable material not exceeding 2m deep below natural or reduced ground level: 3 Holes. m3 2 Carting away. 4 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 2 Filling with approved natural gravel material (G5) supplied and carted onto site by the Contractor and compacted to 95% Mod AASHTO density: 5 Under trenches, holes, surface beds, etc. m3 1
Appears in 13 contracts
Samples: themvulatrust.org.za, themvulatrust.org.za, themvulatrust.org.za
SITE CLEARANCE ETC. 1 Allow for clearing the area of the site to be built upon of all grass, weeds, shrubs, trees with trunks not exceeding 200mm girth, debris, etc., including grubbing up all roots, scoffling up as required and cart away all vegetation and debris. m2 9 14 2 Stripping average 300mm thick layer of topsoil and stockpiling on site. m2 9 14 Excavate in pickable material not exceeding 2m deep below natural or reduced ground level: 3 Holes. m3 2 Carting away. 4 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 2 Filling with approved natural gravel material (G5) supplied and carted onto site by the Contractor and compacted to 95% Mod AASHTO density: 5 Under trenches, holes, surface beds, etc. m3 1
Appears in 6 contracts
Samples: themvulatrust.org.za, themvulatrust.org.za, themvulatrust.org.za