SITE CLEARANCE ETC. 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs and trees not exceeding 200mm girth, xxxx, etc A1 : 96 A2 : 93 A3 : 110 2 Stripping average 200mm thick layer of topsoil and stockpiling on site. A1 : 96 A2 : 93 A3 : 110 EXCAVATION OTHER THAN BULK Excavation in earth not exceeding 2m deep: 3 Trenches. A1 : 3 A2 : 3 A3 : 3 4 Holes. A1 : 54 A2 : 41 A3 : 76 5 Reduced levels under floors. A1 : 6 A2 : 6 A3 : 7 m2 299 m2 299 m3 9 m3 171 m3 19 Carried to Collection R Section 2 Bill No. 1 Earthworks (Provisional)

Appears in 4 contracts

Samples: themvulatrust.org.za, themvulatrust.org.za, themvulatrust.org.za

AutoNDA by SimpleDocs

SITE CLEARANCE ETC. 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs and trees not exceeding 200mm girth, xxxx, etc A1 : 96 104 A2 : 93 A3 : 110 A4 : 95 2 Stripping average 200mm thick layer of topsoil and stockpiling on site. A1 : 96 104 A2 : 93 A3 : 110 A4 : 95 EXCAVATION OTHER THAN BULK Excavation in earth not exceeding 2m deep: 3 Trenches. A1 : 3 A2 : 3 A3 : 3 A4 : 3 4 Holes. A1 : 54 62 A2 : 41 A3 : 76 67 A4 : 59 5 Reduced levels under floors. A1 : 6 7 A2 : 6 A3 : 7 A4 : 6 m2 299 402 m2 299 402 m3 9 12 m3 171 229 m3 19 26 Carried to Collection R Section 2 Bill No. 1 Earthworks (Provisional)

Appears in 3 contracts

Samples: themvulatrust.org.za, themvulatrust.org.za, themvulatrust.org.za

SITE CLEARANCE ETC. 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs and trees not exceeding 200mm girth, xxxx, etc A1 : 96 A2 : 93 A3 : 110 2 Stripping average 200mm thick layer of topsoil and stockpiling on site. A1 : 96 A2 : 93 A3 : 110 EXCAVATION OTHER THAN BULK Excavation in earth not exceeding 2m deep: 3 Trenches. A1 : 3 A2 : 3 A3 : 3 4 Holes. A1 : 54 A2 : 41 A3 : 76 5 Reduced levels under floors. A1 : 6 A2 : 6 A3 : 7 m2 299 m2 299 m3 9 m3 171 m3 19 Carried to Collection R Section 2 3 Bill No. 1 Earthworks (Provisional)

Appears in 1 contract

Samples: themvulatrust.org.za

SITE CLEARANCE ETC. 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs and trees not exceeding 200mm girth, xxxx, etc A1 : 96 A2 : 90 A3 : 93 A3 A4 : 110 2 Stripping average 200mm thick layer of topsoil and stockpiling on site. A1 : 96 A2 : 90 A3 : 93 A3 A4 : 110 EXCAVATION OTHER THAN BULK Excavation in earth not exceeding 2m deep: 3 Trenches. A1 : 3 A2 : 3 A3 : 3 A4 : 3 4 Holes. A1 : 54 A2 : 50 A3 : 41 A3 A4 : 76 5 Reduced levels under floors. A1 : 6 A2 : 6 A3 : 6 A4 : 7 m2 299 389 m2 299 389 m3 9 12 m3 171 221 m3 19 25 Carried to Collection R Section 2 Bill No. 1 Earthworks (Provisional)

Appears in 1 contract

Samples: themvulatrust.org.za

SITE CLEARANCE ETC. 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs and trees not exceeding 200mm girth, xxxx, etc A1 : 96 104 A2 : 93 164 A3 : 110 A4 : 110 2 Stripping average 200mm thick layer of topsoil and stockpiling on site. A1 : 96 104 A2 : 93 164 A3 : 110 A4 : 110 EXCAVATION OTHER THAN BULK Excavation in earth not exceeding 2m deep: 3 Trenches. A1 : 3 A2 : 4 A3 : 3 A3 A4 : 3 4 Holes. A1 : 54 62 A2 : 41 48 A3 : 76 A4 : 67 5 Reduced levels under floors. A1 : 6 7 A2 : 6 10 A3 : 7 A4 : 7 m2 299 488 m2 299 488 m3 9 13 m3 171 253 m3 19 31 Carried to Collection R Section 2 3 Bill No. 1 Earthworks (Provisional)

Appears in 1 contract

Samples: themvulatrust.org.za

AutoNDA by SimpleDocs

SITE CLEARANCE ETC. 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs and trees not exceeding 200mm girth, xxxx, etc A1 : 96 A2 : 93 83 A3 : 110 93 A4 : 83 2 Stripping average 200mm thick layer of topsoil and stockpiling on site. A1 : 96 A2 : 93 83 A3 : 110 93 A4 : 83 EXCAVATION OTHER THAN BULK Excavation in earth not exceeding 2m deep: 3 Trenches. A1 : 3 A2 : 3 2 A3 : 3 A4 : 2 4 Holes. A1 : 54 A2 : 41 50 A3 : 76 41 A4 : 50 5 Reduced levels under floors. A1 : 6 A2 : 6 5 A3 : 7 6 A4 : 5 m2 299 355 m2 299 355 m3 9 10 m3 171 195 m3 19 22 Carried to Collection R Section 2 Bill No. 1 Earthworks (Provisional)

Appears in 1 contract

Samples: themvulatrust.org.za

SITE CLEARANCE ETC. 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs and trees not exceeding 200mm girth, xxxx, etc A1 : 96 104 A2 : 93 164 A3 : 110 A4 : 110 2 Stripping average 200mm thick layer of topsoil and stockpiling on site. A1 : 96 104 A2 : 93 164 A3 : 110 A4 : 110 EXCAVATION OTHER THAN BULK Excavation in earth not exceeding 2m deep: 3 Trenches. A1 : 3 A2 : 4 A3 : 3 A3 A4 : 3 4 Holes. A1 : 54 62 A2 : 41 48 A3 : 76 A4 : 67 5 Reduced levels under floors. A1 : 6 7 A2 : 6 10 A3 : 7 A4 : 7 m2 299 488 m2 299 488 m3 9 13 m3 171 253 m3 19 31 Carried to Collection R Section 2 Bill No. 1 Earthworks (Provisional)

Appears in 1 contract

Samples: themvulatrust.org.za