Site Concrete. Visitor entry slabs, employee entry slabs, dock area slabs, sidewalks and all concrete curbs will be provided as shown on the Site Plan. All site concrete will be broom finished, standard grey concrete. All exterior concrete to be air entrained 4,000 psi compressive strength average in 28 days. Dining area patio pavement will be included as a part of the Tenant improvement scope.
AutoNDA by SimpleDocs
Site Concrete. Concrete slabs at the dining area patio are included as shown on the base building Site Plan. Patio concrete will be air entrained 4,000 psi compressive strength (average in 28 days). Concrete shall be standard grey color.
Site Concrete. The following assumptions further define the scope of work and value as indicated in the documents listed below.
Site Concrete. 2.7.1 Site concrete will consist of those items shown on the drawings. 2.7.2 Sidewalk(s) will be provided as indicated on the drawings and will be 4" thick. 2.7.3 All sidewalks abutting paving will have a 6" raised face. 2.7.4 The concrete mix will be designed to accomplish a strength of 3500 PSI at a 28 day test and will include air entrainment. 2.7.5 Drive approach area(s) will be completed as shown and will be constructed in accordance with the requirements of the governing agencies having jurisdiction. 2.7.6 All exterior flat slabs will be steel troweled and then finished with a broom finish.
Site Concrete. All sidewalks to be grey color. · All parking lot concrete curbs will be gxxx concrete and per MAG standards.

Related to Site Concrete

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Materials of Environmental Concern have not been transported or disposed of from the Properties in violation of, or in a manner or to a location which could give rise to liability under, any Environmental Law, nor have any Materials of Environmental Concern been generated, treated, stored or disposed of at, on or under any of the Properties in violation of, or in a manner that could give rise to liability under, any applicable Environmental Law, except insofar as any such violation or liability referred to in this paragraph, or any aggregation thereof, could not reasonably be expected to result in the payment of a Material Environmental Amount.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Waste Borrower shall not commit or suffer any waste of the Property or make any change in the use of the Property which will in any way materially increase the risk of fire or other hazard arising out of the operation of the Property, or take any action that might invalidate or give cause for cancellation of any Policy, or do or permit to be done thereon anything that may in any way impair the value of the Property or the security of this Security Instrument. Borrower will not, without the prior written consent of Lender, permit any drilling or exploration for or extraction, removal, or production of any minerals from the surface or the subsurface of the Land, regardless of the depth thereof or the method of mining or extraction thereof.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Insulation In exterior walls? Yes No Unknown In ceiling/attic? Yes No Unknown In any other areas? Yes No Where? Comments:

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • Wash all machine-washable bedding, drapes, and clothing, on the hottest water temperature and dry on the highest heat setting. Items that cannot be washed must be taken to a dry cleaner who MUST be informed of the issue. You must safely discard ALL items that cannot be decontaminated.