SMM Driver, Power-Up Sample Clauses

SMM Driver, Power-Up. The SMM driver gains control of the processor before any other driver; this means that the Host Controller will be in the state that it enters after a hardware reset (USBRESET). The SMM driver must set the InterruptRouting bit in the HcControl register. This causes all Host Controller interrupts to be routed to the SMI. Since the SMM driver is system-specific, if it has knowledge of proper settings for system-specific fields in the Host Controller registers, it should set those to their proper values at this time. These fields include: RemoteWakeupConnected in the HcControl register, FrameInterval and FSLargestDataPacket in the HcFmInterval register, PowerSwitchingMode and OverCurrentProtection in the HcRhDescriptorA register, and PowerOnToPowerGoodTime and RemovableDevice in the HcRhDescriptorB register. The driver should then wait at least the minimum time specified in the USB Specification for assertion of reset on the USB before it proceeds to the setup of the HC.
AutoNDA by SimpleDocs

Related to SMM Driver, Power-Up

  • Police Powers The Grantee agrees to comply with the terms of any lawfully adopted generally applicable local ordinance necessary to the safety, health, and welfare of the public, to the extent that the provisions of the ordinance do not have the effect of limiting the benefits or expanding the obligations of the Grantee that are granted by this Franchise. This Franchise is a contract and except as to those changes which are the result of the Grantor’s lawful exercise of its general police power, the Grantor may not take any unilateral action which materially changes the mutual promises in this contract.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Real and Reactive Power Control 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 ARTICLE 10. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43 ARTICLE 11. PERFORMANCE OBLIGATION 43

  • Charter Schools A. Notification to Polk Education Association

  • Statutory Powers For the purposes of all powers implied by statute the Secured Obligations shall be deemed to have become due and payable on the date of this Assignment.

  • OWNERSHIP ACT (OR THE RELEVANT STATE ACT The Promoter has assured the Allottees that the project in its entirety is in accordance with the provisions of the West Bengal Housing Industry Regulation Act, 2017 (Xxxx Xxx. Act XLI of 2017) and registered with West Bengal Housing Industry Regulation Rules, 2018. The Promoter showing compliance of various laws/regulations as applicable in the State of West Bengal.

  • Other Necessary Acts Each party shall execute and deliver to the other all such further instruments and documents as may be reasonably necessary to carry out this Agreement in order to provide and secure to the other parties the full and complete enjoyment of rights and privileges hereunder.

  • Cloud Computing State Risk and Authorization Management Program In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

  • All-Requirements Power Supply The service under which the Competitive Supplier provides all of the electrical energy, capacity, reserves, and ancillary services, transmission services, transmission and distribution losses, congestion management, and other such services or products necessary to provide firm power supply to Participating Consumers at the Point of Delivery.

  • Management of Company 5.1.1 The Members, within the authority granted by the Act and the terms of this Agreement shall have the complete power and authority to manage and operate the Company and make all decisions affecting its business and affairs.

Time is Money Join Law Insider Premium to draft better contracts faster.