Soils/Geology Sample Clauses

Soils/Geology. A soils and geological report for the subdivision in which the Property is located is on file with the County in which the Property is located. Buyer agrees not to alter the grading and any drainage devices on the Property and/or Project in a manner that would increase the intrusion of moisture into the soils of the Common Area (as defined in the CC&Rs), or into or onto the Condominium Buildings and other improvements constructed thereon. This Paragraph 7.4 shall survive the Close Date.
AutoNDA by SimpleDocs

Related to Soils/Geology

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • Geotechnical Engineer « »« » « » « » « » « »

  • First sampling In the first sampling four lamps are selected at random. The first sample of two is marked A, the second sample of two is marked B.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • ARCHAEOLOGY Lessee shall not destroy, disturb, mar, collect, remove or alter any prehistoric or historic resources of any kind on Weld County lands as provided by law. These resources include, but are not limited to, all artifacts of stone, wood or metal, pictographs, structures, and bones. A discovery of anything of prehistoric or historic nature shall be reported to Lessor or the State of Colorado Archaeologist immediately.

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

Time is Money Join Law Insider Premium to draft better contracts faster.