Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.
Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.
Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6
meminta nasihat daripada Pihak Xxxxxx dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik Xxxxx xxxxxx rasmi di Pejabat Tanah xxx/atau xxxx-xxxx Pihak-pihak Berkuasa yang berkenaan xxx (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja xxx juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya ("Pembeli") dikehendaki dengan segera memohon xxx mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju xxx/atau Pihak Tuanpunya xxx/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa xxx memastikan samada jualan ini dikenakan cukai. HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan HAKMILIK INDUK / NO. LOT : Pajakan Negeri 35263, Lot No.29096 MUKIM/DAERAH/NEGERI : Setapak / Kuala Lumpur / Wilayah Persekutuan Kuala Lumpur PEGANGAN : Pajakan selama 82-tahun berakhir pada 08/08/2085 KELUASAN LANTAI : 81.104 meter persegi ( 873 kaki persegi ) PEMAJU/PENJUAL : Mega Planner Jaya Sdn Bhd (326287-W)(Dalam Likuidasi) TUANPUNYA : Datuk Bandar Kuala Lumpur PEMBELI : Xxxxxxxx Bin Xxxxx @ Xxxx BEBANAN : Diserahhak kepada RHB Bank Berhad [196501000373 (6171-M)] Hartanah tersebut terletak di tingkat 9 pada bangunan apartment 14-tingkat terletak di Melati Impian Apartment, Setapak Fasa 1, Kuala Lumpur. Hartanah tersebut adalah sebuah unit apartment 3 xxxxx dikenali sebaga Xxxxx Pemaju No. 9, Tingkat No.9, Pembangunan dikenali sebagai Melati Impian Apartment Setapak Fasa 1, Kuala Lumpur xxx mempunyai alamat surat-xxxxxxxx xx Xxxx Xx. 0-0, Xxxxxx Impian Apartment, Xxxxx 0/00X, Xxxxx Xxxxxx, 00000 Xxxxx Xxxxxx, Xxxxxxx Xxxxxxxxxxx Xxxxx Xxxxxx. Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 300,000.00 (RINGGIT MALAYSIA: TIGA RATUS RIBU SAHAJA) xxx tertakluk kepada syarat-syarat Jualan xxx melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat xxx perjanjian yang dikenakan xxx mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi xxx mematuhi syarat-syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada xxx semua xxx xxx perbelanjaan ditanggung xxx dibayar oleh Xxxxx Xxxxxxx.Pembeli atas talian (online) juga tertakluk kepada terma-terma xxx syarat-syarat terkandung dalam xxx.xxxxxxxxxxxxxxxx.xxx Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Bank Berhad sebelum lelongan awam xxx xxxx xxxx xxxxxx hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Bank Berhad melalui Bank Draf / XXXXXX. Butir-butir pembayaran melalui XXXXXX, xxxx berhubung dengan Tetuan Zahrin Emrad & Sujaihah. Untuk maklumat lanjut, xxxx berhubung dengan TETUAN ZAHRIN EMRAD & SUJIAHAH, yang beralamat di Suite 10.3, 10th Floor, Xxx Xxxx Building, Xx.00, Xxxxx Xxxx Xxxxxx, 00000 Xxxxx Xxxxxx. Tel: 00-0000 0000 / Fax: 00-0000 0000. [ Ruj: ZES/ZHR/RHB-FC/16250-17/0614-pae ], peguamcara bagi pihak pemegang xxxxx xxx atau pelelong yang tersebut dibawah.
Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis. 1.8.2 The NYISO is required to pay the Interconnection Customer for reactive power, or voltage support service, that the Interconnection Customer provides from the Small Generating Facility in accordance with Rate Schedule 2 of the NYISO Services Tariff.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.
Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.
Power Supply The source of power for the VAS shall either be the vehicle battery or a rechargeable battery. Where provided, an additional rechargeable or non-rechargeable battery may be used. These batteries shall by no means supply energy to other parts of the vehicle electrical system.
NO HARDSTOP/PASSIVE LICENSE MONITORING Unless an Authorized User is otherwise specifically advised to the contrary in writing at the time of order and prior to purchase, Contractor hereby warrants and represents that the Product and all Upgrades do not and will not contain any computer code that would disable the Product or Upgrades or impair in any way its operation based on the elapsing of a period of time, exceeding an authorized number of copies, advancement to a particular date or other numeral, or other similar self-destruct mechanisms (sometimes referred to as “time bombs,” “time locks,” or “drop dead” devices) or that would permit Contractor to access the Product to cause such disablement or impairment (sometimes referred to as a “trap door” device). Contractor agrees that in the event of a breach or alleged breach of this provision that Authorized User shall not have an adequate remedy at law, including monetary damages, and that Authorized User shall consequently be entitled to seek a temporary restraining order, injunction, or other form of equitable relief against the continuance of such breach, in addition to any and all remedies to which Authorized User shall be entitled.