Solar Source Sample Clauses

Solar Source. The solar source component delivers the sea level irradiance level in W/m2, which is the main input for the photovoltaic modules model. This is based on the time, date and position of the ship. In order to calculate the likely irradiance level, data is being used from the Satellite Application Facility on Climate Monitoring (CM SAF), run by the European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT). CM SAF is a consortium project with contributions of several European meteorological services (FMI, KNMI, Meteo Swiss, RMIB, SMHI) with Deutscher Wetterdienst (DWD, Germany) as the leading entity. Specifically, the data used for this project is the CM SAF Surface Radiation MVIRI Data Set. The data set is a satellite-based climatology of the surface irradiance, the surface direct irradiance and the effective cloud albedo derived from satellite-observations from the visible channel of the MVIRI instruments on board the geostationary Meteo satellites. The data covers the years 1983 to 2005 and covers the region ±70° longitude and ±70° latitude. This region includes the majority of the Pacific Ocean, parts of the Norwegian Sea, parts of the Southern Ocean, the Celtic Sea, English Chanel, North Sea, Baltic Sea, Mediterranean and the Black Sea. Data is available as hourly averages on a regular latitude/longitude grid with a spatial resolution of 0.03° x 0.03° degrees. An example of 1 hour of data is shown in Figure 6. Figure 6: One hour mean surface irradiance for 1pm GMT on the 29th August 1985. Product name XXX000000000000000000000000XX.xx. Displayed using NASA’s Panoply software NAREC has manipulated the data using the Climate Data Operators (CDO) from Max-Xxxxxx-Institute für Meteorology and open source net CDF Operators (NCO). This is allowing NAREC to calculate a mean year on a temporal resolution of one hour periods to be constructed covering the -70 +70 degrees in 0.03 x 0.03° squares. A look up table is being created from this data, which can then be queried by a simple Matlab/Simulink process which uses an operational profile, splits it into positions on the 0.03 by 0.03 grid. A further addition to the model will be a shading calculation. When the reference ship is decided upon, it is the intention to have a calculation of the shadows based on position, date and time. The current progress on this is using a RUBY based script and the free software Trimble Sketch up (previously known as Google Sketch up). The outputs from this syst...
AutoNDA by SimpleDocs

Related to Solar Source

  • Special Service networks The following services must be received from special service network providers in order to be covered. All terms and conditions outlined in the Summary of Benefits apply.

  • Procurement Plan 8. The Borrower shall update the Procurement Plan as needed throughout implementation of the Project, and on each anniversary of the Effective Date, the Borrower shall in consultation with ADB determine whether the Procurement Plan needs to be updated. The Borrower shall implement the Procurement Plan in the manner in which it has been approved by ADB.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Purchase Order Flip via Ariba Network (AN) The online process allows suppliers to submit invoices via the AN for catalog and non- catalog goods and services. Contractors have the ability to create an invoice directly from their Inbox in their AN account by simply “flipping” the purchase order into an invoice. This option does not require any special software or technical capabilities. For the purposes of this section, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider of MFMP the right and license to use, reproduce, transmit, distribute, and publicly display within the system the information outlined above. In addition, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider the right and license to reproduce and display within the system the Contractor’s trademarks, system marks, logos, trade dress, or other branding designation that identifies the products made available by the Contractor under the Contract.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Network Interface Device (NID) 2.7.1 The NID is defined as any means of interconnection of end-user customer premises wiring to BellSouth’s distribution plant, such as a cross-connect device used for that purpose. The NID is a single-line termination device or that portion of a multiple-line termination device required to terminate a single line or circuit at the premises. The NID features two independent xxxxxxxx or divisions that separate the service provider’s network from the end user’s customer-premises wiring. Each chamber or division contains the appropriate connection points or posts to which the service provider and the end user each make their connections. The NID provides a protective ground connection and is capable of terminating cables such as twisted pair cable.

  • Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant-assisted project in accordance with Section 287.057, Florida Statutes.

  • SAFECOM Recipients receiving federal financial assistance awards made under programs that provide emergency communication equipment and its related activities must comply with the SAFECOM Guidance for Emergency Communication Grants, including provisions on technical standards that ensure and enhance interoperable communications.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

Time is Money Join Law Insider Premium to draft better contracts faster.