Specificity of the Works Contract. The Works Contract 3D.3 refers to the extension of flood protection embankments of the estuarine section of the Łęg river - the left embankment at km 0+082-5+030 and the right embankment at km 0+000-5+236. The Contract will be executed in Podkarpackie Province, within the District of Tarnobrzeg, in the Commune of Gorzyce.
AutoNDA by SimpleDocs
Specificity of the Works Contract. The extension of the embankments of the Łęg River will be carried out at the following chainage: km 0+000 to km 5+236 of the right embankment and km 0+082 to km 5+030 of the left embankment. The scope of Works Contract 3D.3 comprises the following elements9: • raising the existing crest of embankments It is planned to raise the existing crest of the embankment to the ordinates of 1.0 m above the level of the authoritative water table (Q1%) and also to the ordinates of 0.3 m above the level of the control water table (Q0.3%). The left embankment is planned to be raised between 0.4 m and 1.6 m, while the right embankment is planned to be raised between 0.5 m and 1.4 m above the existing level. • changing the geometry of the embankments’ cross-section; The crest of the left embankment of the Łęg River will be raised mostly (4,362 m) by superstructure of the downstream slope (relocating the crest towards the area beyond the embankment), while the raising of the crest of the right embankment will be implemented mostly (5,087 m) by superstructure of the upstream slope (relocating the crest towards the embanked area). Along the short sections of both embankments (311 m of the left embankment and 141 m of the right embankment), the crest will be raised in the axis of the existing embankment. In this way, the storage capacity of the embanked area will be maintained. • compacting and sealing the body of embankments and their subsoil Under the Works Contract 3D.3, the existing body of the embankment will be compacted with vibrating rollers and the slopes will be compacted with vibrating plates after removing in prior the 0.2 m thick topsoil layer. The new embankment will be made using the soils indicated in the design, by building in layers with their simultaneous compaction. The benching of the existing slopes of the embankment will be made for a better connection of the existing embankment with the new embankment. The extension of the left embankment assumes the use of the currently existing vertical screen in the foot of the upstream slope and of the inclined, waterproofing screens in the upstream slope. The existing vertical screen reaches a depth of 8-10 m. The inclined sealing exists in the form of a bentonite mat on the section from km 0+082 to km about 0+700, while on the remaining section it is in the form of 2.5 mm thick PVC foil. In the sections where the embankment will be extended towards the area beyond the embankment, an extension of the existing seali...

Related to Specificity of the Works Contract

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.

  • Agreement Exceptions/Deviations Explanation If the proposing Vendor desires to deviate form the Vendor Agreement language, all such deviations must be listed on this attribute, with complete and detailed conditions and information included. TIPS will consider any deviations in its proposal award decisions, and TIPS reserves the right to accept or reject any proposal based upon any deviations indicated below. In the absence of any deviation entry on this attribute, the proposer assures TIPS of their full compliance with the Vendor Agreement. No response

  • Removal of Equipment and Materials Within 30 days after completion of the requirements of this contract, PURCHASER shall remove from the areas of operations, and other property owned or controlled by STATE, all equipment, materials, and other property PURCHASER has placed or caused to be placed thereon that is not to become the property of STATE. It is agreed that any such equipment, materials, and other property that are not removed within 30 days, shall become the property of STATE and may be used or otherwise disposed of by STATE without notice or obligation to PURCHASER or to any party to whom PURCHASER may transfer title. Nothing in this section shall be construed as relieving PURCHASER from an obligation to clean up and to burn, remove, or dispose of debris, waste materials, and such, in accordance with the provisions of this contract. PURCHASER shall indemnify STATE for expenses as a result of cleanup, removal or disposal of debris, waste materials, and such.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • CONSTRUCTION/PUBLIC WORKS CONTRACTS In compliance with Article 8, Section 220 of the New York State Labor Law:

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitation, either by competitive bidding or negotiation, made by the Contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential Subcontractor or supplier shall be notified by the Contractor of the Contractor’s obligations under this Agreement and the Regulations relative to non-discrimination on the grounds of race, color, or national origin.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Equipment and Materials Contractor at its sole cost and expense shall provide and furnish all tools, labor, materials, equipment, transportation services and any other items (collectively, "Equipment") which are required or necessary to perform the Services in a manner which is consistent with generally accepted standards of the profession for similar services. Notwithstanding the foregoing, District shall not be responsible for any damages to persons or property as a result of the use, misuse or failure of any Equipment used by Contractor of the Contracted Parties, even if such Equipment is furnished, rented or loaned to Contractor or the Contracted Parties by District. Furthermore, any Equipment or workmanship that does not conform to the regulations of this Agreement may be rejected by District and in such case must be promptly remedied or replaced by Contractor at no additional cost to District and subject to District’s reasonable satisfaction.

  • Solicitations for Subcontractors, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin, sex, age, and disability/handicap.