Customer-Provided Equipment Comcast shall have no obligation to install, operate, or maintain Customer-Provided Equipment. Customer alone shall be responsible for providing maintenance, repair, operation and replacement of all inside telephone wiring and equipment and facilities on the Customer’s side of the cable modem, route and/or coaxial input connection. All Customer-Provided Equipment and wiring that Customer uses in connection with the Services must be fully compatible with the Services. Customer shall be responsible for the payment of all charges for troubleshooting, maintenance or repairs attempted or performed by Comcast’s employees or authorized contractors when the difficulty or trouble report results from Customer-Provided Equipment.
Required Equipment (a) Towing sling – J/T hook tow chain assembly, a 4”x4”x48” and a 4”x4”x60” wooden crossbeam, a pair of spacer blocks, a steering wheel clamp, a towing dolly and safety chains.
Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.
Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.
SPECIAL TOOLS & TEST EQUIPMENT If the price stated on the Offer includes the cost of any special tooling or special test equipment fabricated or required by the Contractor for the purpose of filling this order, such special tooling equipment and any process sheets related thereto shall become the property of the City and shall be identified by the Contractor as such.
System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
Specified Equipment 4.2.1 Subject to paragraph 4.2.3, the Train Operator has, in relation to a Service, a Firm Right to use any equipment registered with RSSB’s R2 system which has performance characteristics identical to or better than the Timing Load specified in the Rights Table for such Service.
Safe Equipment The City shall furnish and maintain in the best possible working condition, within the limits of its financial capability, the necessary tools, facilities, vehicles, supplies, and equipment required for members to safely carry out their duties. Members are responsible for reporting unsafe conditions or practices, for avoiding negligence, and for properly using and caring for tools, facilities, vehicles, supplies, and equipment provided by the City.
Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.
Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.