Stamped Engineering Design Documents. Subcontractor shall prepare and provide to the DCSEU for approval comprehensive, stamped engineering design documents for the CREF(s) to be installed under this Subcontract. The stamped drawings must include the equipment specification sheets and final system description with the following information: i. System description and size; ii. Installer information; iii. System design/layout; iv. System electrical design; and v. Equipment details, specifications, and cut sheets.
Appears in 3 contracts
Samples: Subcontract Agreement, Subcontract Agreement, Subcontract Agreement
Stamped Engineering Design Documents. Subcontractor shall prepare and provide to the DCSEU for approval comprehensive, stamped engineering design documents for the CREF(s) Project to be installed under this Subcontract. The stamped drawings drawing must include the equipment specification sheets and final system description with the following information:
i. System description and size;
ii. Installer information;
iii. System design/layout;
iv. System electrical design; and
v. Equipment details, specifications, and cut sheets.
Appears in 1 contract
Samples: Subcontract Agreement