Stamped Engineering Design Documents. Subcontractor shall prepare and provide to the DCSEU for approval comprehensive, stamped engineering design documents for the CREF(s) to be installed under this Subcontract. The stamped drawings must include the equipment specification sheets and final system description with the following information:
Appears in 3 contracts
Samples: Protective Agreement, Protective Agreement, Protective Agreement
Stamped Engineering Design Documents. Subcontractor shall prepare and provide to the DCSEU for approval comprehensive, stamped engineering design documents for the CREF(s) Project to be installed under this Subcontract. The stamped drawings drawing must include the equipment specification sheets and final system description with the following information:
Appears in 1 contract
Samples: Subcontract Agreement