STANDARD DETAIL DRAWINGS Sample Clauses

STANDARD DETAIL DRAWINGS. The following Department of Transportation documents are hereby made a part of this contract: The New York City Department of Transportation, Bureau of Signals and Traffic Operations Standard Specifications (“Traffic Blue Book”) which details all the bid items in the contract; City of New York – Division of Street Light Specification; City of New York-Division of Street Lighting Standard Drawings; and All Department of Transportation-Bureau of Traffic, Signal Specification Drawings are available at: NYC – DOT Ground Floor 00 Xxxxx Xxxxxx New York, NY 10041
AutoNDA by SimpleDocs
STANDARD DETAIL DRAWINGS. The following Department of Transportation documents are hereby made a part of this Contract:
STANDARD DETAIL DRAWINGS. The Division of Street Lighting Standard Drawings and Specifications are made part of this Contract. The standard drawings and specifications in book form are available and can be purchased at the following address: NYC – DOT Ground Floor 00 Xxxxx Xxxxxx Xxx Xxxx, XX 00000

Related to STANDARD DETAIL DRAWINGS

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

  • Standard Work Week The standard work week shall be thirty-five (35) hours and is composed of five (5) consecutive standard work days.

  • Subprojects 1. The Borrower shall make Grants to Beneficiaries (Small Farmers, Municipalities and Organizations) for Subprojects (Farmers’ Business Initiatives, Infrastructure Subprojects and Environmental Subprojects) in accordance with eligibility criteria and procedures acceptable to the Bank as further detailed in the Project Operational Manual.

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.

  • Standard Samples Bid Specifications may indicate that the Product to be purchased must be equal to a standard sample on display in a place designated by the Commissioner and such sample will be made available to the Bidder for examination prior to the opening date. Failure by the Bidder to examine such sample shall not entitle the Bidder to any relief from the conditions imposed by the Bid Specifications.