Storage of Material; Partial Payment for Material on Site Sample Clauses

Storage of Material; Partial Payment for Material on Site. The Company may use portions of the Sites for the storage of construction-related material and equipment, subject to the review and approval of the SRWA Construction Manager. The Company shall assume the risk of damage to or loss of any equipment or material stored on any Site (whether caused by vandalism, theft, weather, or other cause) until Final Completion and the filing of the Notice of Completion. The Company may request partial payment for any construction material (i.e., material, equipment, or product to be incorporated into the Design-Build Work) that is delivered to the Sites more than 30 days prior to the scheduled incorporation into the Design-Build Work. The Company may request payment of 90% of the actual net cost of any such early-delivered material (subject to retention as provided elsewhere in the Contract). However, if the subject material requires an operation and maintenance manual, the partial payment amount shall be 75% until a satisfactory manual is provided to SRWA. To request partial payment, the Company shall prepare and submit to the SRWA Construction Manager a partial payment request with a list of the early-delivered material and the accompanying cost at least seven days prior to submitting the monthly Requisition. The SRWA Construction Manager will approve the partial payment request if he or she determines the following:
AutoNDA by SimpleDocs

Related to Storage of Material; Partial Payment for Material on Site

  • Payment for Material Completion The Contractor may request payment of the remaining contract balance, including retainage, less amounts credited the Owner or incurred as liquidated damages, and less amounts withheld for the Punchlist by reason of Minor Items or Permitted Incomplete Work (See Paragraph 6.5.3.2). Payment for Material Completion shall be made by a check payable jointly to the Contractor and Surety and shall be mailed to the Surety.

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Handling of Written Complaints In addition to other remedies contained in the Contract, a person contracting with DIR may direct their written complaints to the following office: Public Information Office Department of Information Resources Attn: Public Information Officer 000 X. 00xx Xxxxxx, Xxxxx 0000 Austin, Texas 78701 (000) 000-0000, facsimile

  • Notice of Non-Compliant Work A Notice of Non-Compliant Work shall be in writing, shall be dated, shall be signed by the Design Professional, and shall be addressed to the Contractor with a copy to the Owner, as set forth in Section 3, Part 4 (Correcting the Work) and Section 6, Part 6 (Correcting the Work after Final Payment).

  • – OWNERSHIP OF THE RESULTS - INTELLECTUAL AND INDUSTRIAL PROPERTY Any results or rights thereon, including copyright and other intellectual or industrial property rights, obtained in performance of the Contract, shall be owned solely by the Agency, which may use, publish, assign or transfer them as it sees fit, without geographical or other limitation, except where industrial or intellectual property rights exist prior to the Contract being entered into.

  • Quality of Materials and Workmanship Unless otherwise specified, all materials shall be new, and both workmanship and materials shall be of good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials and work. The burden of proof is on the Contractor.