Street and Site Circulation Plan. To provide adequate access to adjacent 456 arterials and interior circulation patterns, the Developer shall identify in the Project Phase 2 and 457 the BSP those transportation improvements and pedestrian connections for Project Phase 2 that 458 are the responsibility of the Developer. The City shall review and approve these improvements 459 pursuant to this Agreement and the LMC. The private Lynnwood Place road will not extend or 460 connect to 33rd West until development of Phase 2 Lot 3 as designated on the BSP. 461
AutoNDA by SimpleDocs

Related to Street and Site Circulation Plan

  • zone Information Publication ICANN’s publication of root-zone contact information for the TLD will include Registry Operator and its administrative and technical contacts. Any request to modify the contact information for the Registry Operator must be made in the format specified from time to time by ICANN at xxxx://xxx.xxxx.xxx/domains/root/.

  • Root-­‐zone Information Publication ICANN’s publication of root-­‐zone contact information for the TLD will include Registry Operator and its administrative and technical contacts. Any request to modify the contact information for the Registry Operator must be made in the format specified from time to time by ICANN at xxxx://xxx.xxxx.xxx/domains/root/.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • WASHINGTON’S ELECTRONIC BUSINESS SOLUTION (WEBS). Contractor represents and warrants that it is registered in Washington’s Electronic Business Solution (WEBS), Washington’s contract registration system and that, all of its information therein is current and accurate and that throughout the term of this Master Contract, Contractor shall maintain an accurate profile in WEBS.

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Directory Publication Nothing in this Agreement shall require Verizon to publish a directory where it would not otherwise do so.

  • Construction Progress Meetings The Design Professional shall attend Construction Progress Meetings periodically held by the Contractor at the Site on a schedule determined by the Contractor. The Design Professional shall review the minutes of the meeting and provide his written comments to the minutes to the Owner and Contractor within seven calendar days after receipt of the meeting minutes.