Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 105 contracts
Samples: Sample Agreement, Sample Agreement, Host Employer Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s Contractor‘s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 32 contracts
Samples: Sample Agreement, Sample Agreement, Attachment C – Sample Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 10 contracts
Samples: Attachment F – Sample Agreement, Sample Agreement, Attachment E –
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s 's original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s 's proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s 's Contract Administrator for review and written approval any subcontract(s) specified in the Statement of a Task Work Order as requiring NYSERDA approval, including any replacements thereof.
Appears in 9 contracts
Samples: Attachment D, Sample Agreement, Sample Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s Contractor‘s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 9 contracts
Samples: Attachment B – Sample Agreement, Contractor Confidentiality Agreement, RFQL 4771
Subcontract Procedures. Without relieving it of, or in any ---------------------- way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s 's original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than under $50,00010.000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s 's proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-multi- source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C B to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s 's Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof. The Contractor shall submit to NYSERDA a copy of all fully executed subcontracts and purchase orders that total greater than $10,000.
Appears in 4 contracts
Samples: Restated Agreement (Plug Power Inc), Restated Agreement (Plug Power Inc), Restated Agreement (Plug Power Inc)
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, Agreement and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 3 contracts
Samples: Sample Agreement, Sample Agreement, Sample Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s Contractor‘s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 2 contracts
Samples: www.townofpoundridge.com, Attachment B – Sample Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 2 contracts
Samples: Sample Agreement, Sample Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the forthe purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s Contractor‘s original proposal, and except for any subcontract or order for equipmentforequipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall Contractorshall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the ProjecttheProject. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that andthat the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Saleor Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: play.champds.com
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s Contractor‘s original proposal, and except for any subcontract subcontrac t or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: portal.nyserda.ny.gov
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposalapproved Refurbishment Plan, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, Agreement and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: portal.nyserda.ny.gov
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s 's original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s 's proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.054.04, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s 's Contract Administrator for review and written approval any subcontract(s) specified in the Statement of a Task Work Order as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: Sample Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s Contractor‘s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution cont ibution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record recor summarizing the nature and scope of the work, equipment, supplies sup ies or materials sought, the name of each person or organization submitting, or requested to submito subm t, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplierupplier. An explanation for, and justification of, a sole source selection se ection must identify why the work, equipment, supplies or materials involved are obtainable obt inable from or require a subcontractor with unique or exceptionally scarce qualifications quali ications or experience, specialized equipment, or facilities not readily available from other sourcesources, or patents, copyrights, or proprietary data. All Subcontracts shall contain shal ontain provisions comparable omparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all a l other provisions now or hereafter required by law to be contained therein. Each ach Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict conf ict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interestContrac or. If this Agreement includes a provision requiring Contractor Contra tor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the he provisions of Section 8.02, suitably modified to identify the parties. parties The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any a y subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, approval including any replacements thereof.
Appears in 1 contract
Samples: Attachment C
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s 's original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source mult -source price review. A team arrangement is one where a subcontractor or supplier specified pe ified in the Contractor’s 's proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selectionelec ion. The Contractor shall document the process by which a subcontractor or supplier is selected by b making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, mat rials soug the name of each person or organization submitting, or requested to submitsubm t, a bid bi or proposal, the price or fee bid, and the basis for selection of the subcontractor or o supplier. An n explanation for, and justification of, a sole source selection must identify why the workw rk, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily eadily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained thereinther in. Each Subcontract Subcont act shall make express reference to this Agreement, and shall state that in the event vent of any conflict onflict or inconsistency between any Subcontract and this Agreement, the he terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s 's Contract Administrator Adminis ator for review re w and written approval any subcontract(s) specified in the Statement of a Task Work Order as requiring NYSERDA requi ng NYSE DA approval, including any replacements thereof.
Appears in 1 contract
Samples: Attachment E
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA the Consortium under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or and identify patents, copyrights, or proprietary datadata causing the sole source selection. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, Agreement and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator the Consortium for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA the Consortium approval, including any replacements thereof.
Appears in 1 contract
Samples: National Offshore Wind Research and Development Consortium Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s Contractor‘s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-multi- source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: portal.nyserda.ny.gov
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, Agreement and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: Sample Agreement
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor subcontractor, supplier or supplier other team member specified in a team arrangement with the Contractor in the Contractor’s original proposal“team application” under the RFP, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: portal.nyserda.ny.gov
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor Subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract Subcontract or order for equipment, supplies or materials from a single subcontractor Subcontractor or supplier totaling less than under $50,00015,000, the Contractor shall select all subcontractors Subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor Subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor Subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor Subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor Subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor Subcontractor or supplier, and those set forth in Exhibit C B to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(sSubcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: Agreement (Daystar Technologies Inc)
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor Subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s 's original proposal, and except for any subcontract Subcontract or order for equipment, supplies or materials from a single subcontractor Subcontractor or supplier totaling less than under $50,00015,000, the Contractor shall select all subcontractors Subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor Subcontractor or supplier specified in the Contractor’s 's proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor Subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor Subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor Subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor Subcontractor or supplier, and those set forth in Exhibit C B to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s 's Contract Administrator for review and written approval any subcontract(sSubcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.
Appears in 1 contract
Samples: Beacon Power Corp
Subcontract Procedures. Without relieving it of, or in any way limiting, its obligations to NYSERDA the Consortium under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor Subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract Subcontract or order for equipment, supplies or materials from a single subcontractor Subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors Subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor Subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor Subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor Subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor Subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or and identify patents, copyrights, or proprietary datadata causing the sole source selection. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor Subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, Agreement and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator the Consortium for review and written approval any subcontract(sSubcontract(s) specified in the Statement of Work as requiring NYSERDA the Consortium approval, including any replacements thereof.
Appears in 1 contract
Samples: nationaloffshorewind.org