Submittal of Production and Volume Information Sample Clauses

Submittal of Production and Volume Information. The Lessee, in cooperation with the dredge contractor, will submit to BOEM a summary of the dredge track lines, outlining any deviations from the Plan, every two weeks. This will include a color- coded plot of the draghead, cutterhead, or other hydraulic or mechanical dredging device, showing any horizontal or vertical dredge violations. The dredge track lines must show dredge status: hoteling, dredging, transiting, or unloading. This map will be in Adobe PDF format. At least every two weeks, the Lessee will electronically provide a report of the construction progress including estimated volumetric production rates to BOEM. The Project completion report, as described below in Stipulation 15, will also include production and volume information.
AutoNDA by SimpleDocs
Submittal of Production and Volume Information. The USACE, in cooperation with the dredge operator, must submit to BOEM a summary of the dredge track lines, outlining any deviations from the original Plan on a biweekly basis. A color- coded plot of the draghead, cutterhead, or other hydraulic or mechanical dredging device will be submitted, showing any horizontal or vertical dredge violations. The dredge track lines must show dredge status: hotelling, dredging, transiting, or unloading. This map will be provided in PDF format. The USACE will provide at least a biweekly report electronically, of the construction progress including estimated volumetric production rates to BOEM. The project completion report, as described below, will also include production and volume information, including Daily Operational Reports.
Submittal of Production and Volume Information. The USACE, in cooperation with the dredge operator, must submit to BOEM every 2 weeks a summary report of dredge activity including the dredge track lines, outlining any deviations from the original Plan. A color-coded plot of the dragheads (port and starboard), cutterhead, or other hydraulic or mechanical dredging device will be submitted for all dredging and transport activity on the OCS, showing any horizontal or vertical dredge violations. Transiting/unloading tracks will also be shown for xxxxxx dredges and scow barges. The dredge track lines must show dredge status, i.e., hoteling, dredging (pump on/off), transiting, or unloading. This map will be provided in PDF format. The USACE will provide at least a biweekly update of the construction progress, including estimated volumetric production rates from the OCS Borrow Areas (both cumulative and for the reporting period) to BOEM. The biweekly deliverables will be provided electronically to BOEM at xxxxxxxxxx@xxxx.xxx and the designated BOEM, Gulf of Mexico OCS Region, Marine Minerals Program POC. The Project completion report, as described below, will also include production and volume information, including Daily Operational Reports.
Submittal of Production and Volume Information. Xxxxxxx County and/or its agents, in cooperation with the dredge operator, will submit to BOEM on a biweekly basis a summary of the dredge track lines, outlining any deviations from the original Plan. A color-coded map of the draghead, cutterhead or other hydraulic or mechanical dredging device will be submitted, showing any horizontal or vertical dredge violations. The dredge track lines will show dredge status, including: hotelling, dredging, transiting, and pump- out. This map will be provided in PDF format. Xxxxxxx County and/or its agents will provide at least a biweekly update of the construction progress including estimated volumetric production rates to BOEM. The biweekly deliverables will be provided electronically to xxxxxxxxxx@xxxx.xxx. The project completion report, as described below, will also include production and volume information, including Daily Operational Reports.
Submittal of Production and Volume Information. The County and/or its agents, in cooperation with the dredge contractor, will submit to BOEM a summary of the dredge track lines, outlining any deviations from the Plan, every two weeks. This will include a color-coded plot of the draghead, cutterhead, or other hydraulic or mechanical dredging device, showing any horizontal or vertical dredge violations. The dredge track lines must show dredge status: hoteling, dredging, transiting, or unloading. This map will be in PDF format. At least every two weeks, the County and/or its agents will electronically provide a report of the construction progress, including estimated volumetric production rates, to BOEM. The project completion report, as described below, will also include production and volume information.