Supplementary Fund Source Table(s Sample Clauses

Supplementary Fund Source Table(s. Reserved. This Attachment B does not contain any supplementary fund source tables.
AutoNDA by SimpleDocs

Related to Supplementary Fund Source Table(s

  • SUPPLEMENTARY INDEX Exhibit A-Local Church Vote Certification Exhibit B-Bill of Sale Exhibit C-Deed(s) Exhibit D-FIRPTA Schedule 3.2-Other Liabilities Schedule 3.4-Financial Statements Schedule 4.3-Subsidiaries Schedule 4.7-Leases & Land Schedule 4.8-Personal Property EXHIBIT A Local Church Certification EXHIBIT B Bill of Sale [Form]

  • Supplementary Labour (a) If the Employer wishes to engage supplementary labour to perform work performed by its Employees under this Agreement, the Employer must first consult in good faith with the affected Employees.

  • SUPPLEMENTAL SALARY SCHEDULE 12.01 Every effort shall be made by the Board to post supplemental positions in a timely manner each school year. Teachers in the bargaining unit may apply for the supplemental vacancy within ten (10) working days of each posting. If no qualified bargaining unit member applies for the supplemental position, the Board may fill the vacancy with individuals not in the bargaining unit.

  • SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" GLAZING TO STEEL WITH PUTTY 4mm Obscure safety glass: 1 Panes not exceeding 0,1 m2 m2 3 Carried Forward to Summary of Section No. 3 R Section No. 3 SMD1 Bill No. 11 GLAZING BVI CONSULTING ENGINEERS Amount Item No SECTION 3 Quantity Rate Amount BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 6 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 3 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD1 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD1 Bill No Page No 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD1 BVI CONSULTING ENGINEERS Amount R Item No SECTION 4 Quantity Rate Amount BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 73 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 73 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 18 4 Pit m3 27 5 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 49 7 Hard rock m3 49 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 35 Carried Forward Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Brought Forward R Risk of collapse of excavations: 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 82 Keeping excavations free of water: 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 11 Under floors, steps, pavings, etc. m3 7 12 Backfilling to trenches, holes, etc. m3 9 Compaction of surfaces: 13 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 25 14 Compaction of ground surface to pits etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 20 15 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 44 Prescribed density tests on filling: 16 Modified AASHTO Density tests No 5 SOIL POISONING Carried Forward R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS Brought Forward R Soil insecticide: 17 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 25 18 To bottom of concrate aprons m2 44 19 To bottoms and sides of trenches, etc. m2 69 Carried Forward to Summary of Section No. 4 R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Amount

  • Supplementary Vacation The supplementary vacations as set out below are to be banked on the outlined supplementary vacation employment anniversary date and taken at the employee’s option at any time subsequent to the current supplementary vacation employment anniversary date but prior to the next supplementary vacation employment anniversary date.

  • Supplementary Terms Other Contributions

  • What Forms of Distribution Are Available from a Xxxxxxxxx Education Savings Account Distributions may be made as a lump sum of the entire account, or distributions of a portion of the account may be made as requested.

  • Supplementary Card a card which is issued by the Bank to the client and/or other person nominated by the client and which is linked to the existing card account of the client;

  • Supplementary Provisions 15.1 This Agreement is executed in two original copies and each Party shall keep one.

  • When Must Distributions from a Xxxxxxxxx Education Savings Account Begin? Distribution of a Xxxxxxxxx Education Savings Account must be made (or otherwise will be deemed made) no later than 30 days from the earlier of the beneficiary’s death or attainment of age 30. A distribution from a Xxxxxxxxx Education Savings Account may be rolled over to another beneficiary’s Xxxxxxxxx Education Savings Account according to the requirements of Section (4). Note that the Economic Growth and Tax Relief Reconciliation Act of 2001 waives the distribution age limitation if the beneficiary of the Xxxxxxxxx Education Savings Account is a “Special Needs” student.

Time is Money Join Law Insider Premium to draft better contracts faster.