Task 3: Geophysical Survey Sample Clauses

Task 3: Geophysical Survey. The County with assistance from its Consultant and Subcontractors shall conduct a geophysical survey using electromagnetic and ground penetrating radar techniques to delineate the lateral and vertical extent of waste materials in the Disposal Area. The product of the survey shall be a geo-located map showing the extent of the landfill and cross-sections describing the depth of disposed materials. County shall provide a copy of the geophysical survey report to DEQ.
AutoNDA by SimpleDocs

Related to Task 3: Geophysical Survey

  • Geotechnical Engineer « »« » « » « » « » « »

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.

  • EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Engineering Reports (a) Not less than 30 days prior to each Scheduled Borrowing Base Redetermination Date, commencing with the Scheduled Borrowing Base Redetermination to occur on or around March 15, 2007, the Borrower shall furnish to the Administrative Agent and the Lenders a Reserve Report. The Reserve Reports delivered in connection with each March 15 Scheduled Borrowing Base Redetermination, commencing March 15, 2007, shall be prepared by certified independent petroleum engineers or other independent petroleum consultant(s) acceptable to the Administrative Agent. The Reserve Reports delivered in connection with each September 15 Scheduled Borrowing Base Redetermination, commencing September 15, 2007, shall be prepared by or under the supervision of the chief engineer of the Borrower and a Responsible Officer shall certify such Reserve Report to be true and accurate and to have been prepared in accordance with the procedures used in the immediately preceding Scheduled Borrowing Base Redetermination Reserve Report. (b) In the event of an unscheduled redetermination, the Borrower shall furnish to the Administrative Agent and the Lenders a Reserve Report prepared by or under the supervision of the chief engineer of the Obligors together with the certificate of a Responsible Officer who shall certify such Reserve Report to be true and accurate and to have been prepared in accordance with the procedures used in the immediately preceding Reserve Report. For any unscheduled redetermination requested by the Lenders or the Borrower pursuant to Section 2.08(d), the Borrower shall provide such Reserve Report with an “as of” date as required by the Lenders as soon as possible, but in any event no later than 30 days following the receipt of the request by the Administrative Agent. (c) With the delivery of each Reserve Report, the Borrower shall provide, or cause to be provided, to the Administrative Agent and the Lenders, a certificate from a Responsible Officer certifying that, to the best of his knowledge and in all material respects: (i) the information contained in the Reserve Report and any other information delivered in connection therewith is true and correct, (ii) the Obligors and the Partnerships own good and marketable title to the Oil and Gas Properties evaluated in such Reserve Report and such Properties are free of all Liens except for Liens permitted by Section 9.03, (iii) except as set forth on an exhibit to the certificate, on a net basis there are no gas imbalances, take or pay or other prepayments with respect to its Oil and Gas Properties evaluated in such Reserve Report which would require any Obligor to deliver Hydrocarbons produced from such Oil and Gas Properties at some future time without then or thereafter receiving full payment therefor, (iv) none of Obligor’s or and the Partnerships’ Oil and Gas Properties have been sold since the date of the last Borrowing Base determination except as set forth on an exhibit to the certificate, which certificate shall list all of its Oil and Gas Properties sold and in such detail as reasonably required by the Administrative Agent, (v) attached to the certificate is a list of its Oil and Gas Properties added to and deleted from the immediately prior Reserve Report and a list showing any change in working interest or net revenue interest in its Oil and Gas Properties occurring and the reason for such change, (vi) attached to the certificate is a list of all Persons disbursing proceeds to the Obligors from their Oil and Gas Properties, and (vii) all of the Oil and Gas Properties evaluated by such Reserve Report are Mortgaged Property except as set forth on a schedule attached to the certificate.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Title Reports With respect to each Closing Date Mortgaged Property listed in Part B of Schedule 4.1N annexed hereto, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the Closing Date and satisfactory in form and substance to Administrative Agent;

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!