Pre Design Engineering Sample Clauses

Pre Design Engineering. Pre-design engineering will be completed at the Disposal Area to compile information needed to prepare the remedial design. The pre-design engineering activities are summarized below. i) Task 1: Work Plan Prior to implementing pre-design engineering data collection, the County with assistance from its Consultant and Subcontractors shall prepare a Work Plan and Health and Safety Plan (HASP). The Work Plan shall summarize the scope of work for the geophysical survey and sample collection, identify specific sampling procedures, and include a perimeter air monitoring plan. The HASP shall be prepared in general accordance with the Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 and applicable Oregon Administrative Rule. The County shall submit the Work Plan and HASP in draft form to DEQ for approval. Upon receipt of DEQ’s comments, the County shall revise the Work Plan and HASP to incorporate feedback. The County shall re-submit revised reports to DEQ until DEQ approves. ii) Task 2: Topographic Survey A detailed topographic survey of the Disposal Area was completed by S&F Land Services in 2023 and is sufficient for generating the base site plan. County shall provide a copy of the topographic survey report to DEQ.
AutoNDA by SimpleDocs
Pre Design Engineering 

Related to Pre Design Engineering

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Professional Engineering and Architect’s Services Professional Engineering and Architect’s Services are not permitted to be provided under this Agreement. Texas statutes prohibit the procurement of Professional Engineering and Architect’s Services through a cooperative agreement.

  • Engineering Services Definition: Engineering Services includes any service or creative work, the adequate performance of which requires education, training and experience in the application of special knowledge in consulting, investigating, evaluating, planning and designing, engineering principles. Engineering Services covered by the Xxxxxx Architect-Engineers Act (40 U.S.C. 1102) are not covered in the primary scope of OASIS SB. Examples: Service areas that are included under the Engineering Services discipline include, but are not limited to the following: 1. Systems Engineering 2. Advanced Technology Pilots and Trials 3. Alternative Energy Sources and Engineering 4. Configuration Management 5. Concept Development

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following; a) the proposed change(s), and a description of the difference to the existing contract requirements; b) a full cost/benefit analysis of the proposed change(s) including a description and estimate of costs (including life cycle costs) the Procuring Entity may incur in implementing the value engineering proposal; and c) a description of any effect(s) of the change on performance/functionality.