MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.
Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.
Mail Order Catalog Warnings In the event that, the Settling Entity prints new catalogs and sells units of the Products via mail order through such catalogs to California consumers or through its customers, the Settling Entity shall provide a warning for each unit of such Product both on the label in accordance with subsection 2.4 above, and in the catalog in a manner that clearly associates the warning with the specific Product being purchased. Any warning provided in a mail order catalog shall be in the same type size or larger than other consumer information conveyed for such Product within the catalog and shall be located on the same display page of the item. The catalog warning may use the Short-Form Warning content described in subsection 2.3(b) if the language provided on the Product label also uses the Short-Form Warning.
No Legal Order Pending There shall not then be in effect any legal or other order enjoining or restraining the transactions contemplated by this Agreement.
Field Order A written order issued by Engineer which requires minor changes in the Work but does not change the Construction Contract Price or the Construction Contract Times.
Technical Safeguards 1. USAC and DSS will process the data matched and any data created by the match under the immediate supervision and control of authorized personnel to protect the confidentiality of the data, so unauthorized persons cannot retrieve any data by computer, remote terminal, or other means. 2. USAC and DSS will strictly limit authorization to these electronic data areas necessary for the authorized user to perform their official duties. All data in transit will be encrypted using algorithms that meet the requirements of the Federal Information Processing Standard (FIPS) Publication 140-2 or 140-3 (when applicable). 3. Authorized system users will be identified by User ID and password, and individually tracked to safeguard against the unauthorized access and use of the system. System logs of all user actions will be saved, tracked and monitored periodically. 4. USAC will transmit data to DSS via encrypted secure file delivery system. For each request, a response will be sent back to USAC to indicate success or failure of transmission.
Technical Documentation Prior to commencement of the Tests on Completion, the Contractor shall supply to the Engineer the technical documentation as specified in the Employer’s Requirements. The Works or Section shall not be considered to be completed for the purposes of taking- over under sub-clause 10.1 [Taking Over of the Works and Sections] until the Engineer has received the technical documentation as defined in this sub-clause 5.7, the "history file" including design calculations and certain certification as well as any other documents required to meet the CE Marking requirements.
Change Orders and Contract Amendments 33.1 The Procuring Entity may at any time order the Supplier through notice in accordance GCC Clause 8, to make changes within the general scope of the Contract in any one or more of the following: a) drawings, designs, or specifications, where Goods to be furnished under the Contract are to be specifically manufactured for the Procuring Entity; b) the method of shipment or packing; c) the place of delivery; and d) the Related Services to be provided by the Supplier. 33.2 If any such change causes an increase or decrease in the cost of, or the time required for, the Supplier's performance of any provisions under the Contract, an equitable adjustment shall be made in the Contract Price or in the Delivery/Completion Schedule, or both, and the Contract shall accordingly be amended. Any claims by the Supplier for adjustment under this Clause must be asserted within twenty-eight (28) days from the date of the Supplier's receipt of the Procuring Entity's change order. 33.3 Prices to be charged by the Supplier for any Related Services that might be needed but which were not included in the Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the Supplier for similar services.
Field Orders The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above).
Technical or Contractual Problems Contractor shall meet with the Department's personnel, or designated representatives, to resolve technical or contractual problems occurring during the contract term or to discuss the progress made by Contractor and the Department in the performance of their respective obligations, at no additional cost to the Department. The Department may request the meetings as problems arise and will be coordinated by the Department. The Department shall provide Contractor a minimum of three full working days notice of meeting date, time, and location. Face-to-face meetings are desired; however, at Contractor's option and expense, a conference call meeting may be substituted. Contractor’s consistent failure to participate in problem resolution meetings, Contractor missing or rescheduling two consecutive meetings, or Contractor’s failure to make a good faith effort to resolve problems may result in termination of the contract.