Tension Sample Clauses

Tension bend staining is a cosmetic issue that does not affect the long-term corrosion protection of the LYNX Series under normal atmospheric conditions. As a result, tension- bend stains, although cosmetically noticeable on light colored paint, do not degrade the structural integrity of the roll-formed panel.
AutoNDA by SimpleDocs
Tension. In this text, for the exclusive purpose of simplifying any comparisons between different systems of medicine (for example, Chinese and humoral), we add the pseudo-humor Tension17, which is responsible for the “functionality” of the whole body or its parts (e.g., the organs). In this sense, it corresponds to the Qi of Chinese medicine but also to other concepts, such as that of the Four Virtues (attractive, retentive, alterative and expulsive) of organs according to Xxxxx (see for example [Xxxxxxxxx]) and it can also be related to the vasoconstriction and vasorelaxation conditions of Physiomedicalism and to Xxxxxxx Xxxx’x Constriction and Relaxation tissue states [Wood]. Tension, defined as a pseudo-humor because it is not contemplated by the classical humoral theory, can be thought of as formally derived from Fire to which a sort of “constraint”, 14 The fermentation and putrefaction processes are generally exothermic or generate a “hot” response from the human body..
Tension. Physical and motor manifestations of nervousness, over-activation.

Related to Tension

  • Extension Time limits specified in this Agreement may be extended by mutual agreement.

  • Contract Extension The City may, in its sole discretion, unilaterally exercise an option to extend the Contract as described in the Contract Documents. In addition, the City may, in its sole discretion, unilaterally extend the Contract on a month-to-month basis following contract expiration if authorized under Charter section 99 and the Contract Documents. Contractor shall not increase its pricing in excess of the percentage increase described in the Contract.

  • PRE-COMMENCEMENT PHASE Part 1 - Pre-commencement Phase Services Part 2 - Construction Documents and Site Plan SECTION 3 – CONSTRUCTION PHASE Part 1 - Construction Phase Services Part 2 - Changes to the Work Part 3 - Time. Part 4 - Correcting the Work, Inspections, Covering and Uncovering Work Part 5 - Subcontractors, Trade Contractors, and Suppliers

  • TIME OF COMMENCEMENT AND COMPLETION 2.1 The Contractor shall commence the Work upon the date established in the Notice to Proceed.

  • Expansion Effective on and as of December 1, 2017 (such date being the -Expansion Commencement Date”), the Premises shall be expanded to include an additional 7,389 square feet of rentable area designated as Suite 100 of the Building (the “Expansion Space”), being more fully shown and described on the floor plan attached hereto as Exhibit A and made a part hereof for all purposes, for a term that is coterminous with the Lease Term. Tenant acknowledges that the Expansion Space is currently occupied by an existing tenant (the “Existing Tenant”) and that Landlord and such Existing Tenant are concurrently herewith entering into an early termination agreement to terminate such Existing Tenant’s lease as of November 30, 2017. Tenant hereby waives any claims against Landlord in the event that such Existing Tenant holds over in the Premises beyond the Expansion Commencement Date. If such Existing Tenant holds over in the Expansion Space beyond the Expansion Commencement Date, the Expansion Commencement Date, and Xxxxxx’s obligation to commence paying rent with respect to the Expansion Space, shall nonetheless still commence on the Expansion Commencement Date. Following such Existing Tenant surrendering the Expansion Space to Landlord, Landlord shall thereafter deliver the same to Tenant. Upon the Expansion Commencement Date, Landlord may prepare and deliver to Tenant a certificate establishing the Expansion Commencement Date, which Tenant shall acknowledge by executing a copy and returning it to Landlord within ten (10) business days after its receipt from Landlord. Failure of Landlord to send any such certificate shall have no effect on the Expansion Commencement Date. In the event there is any delay in the delivery of the Expansion Space to Tenant (including, without limitation, due to the Existing Tenant holding over in the Expansion Space past the expiration of its lease), then this First Amendment shall not be void or voidable, nor shall Landlord be liable to Tenant for any loss or damage resulting therefrom. Xxxxxx has advised Landlord that it intends to permit Existing Tenant continue to occupy the Expansion Space through December 15, 2017, and Landlord hereby consents to Tenant permitting Existing Tenant to remain the Expansion Space through such date; provided, however, the Expansion Commencement Date, and Tenant’s obligation to commence paying rent with respect to the Expansion Space, shall commence on the Expansion Commencement Date.

  • Time Extension CONTRACTOR shall provide a time extension request on completion of Task Order for delays caused by others (Permitting Agencies, COUNTY or Contract Cities, or unforeseen conditions such as inclement weather, etc.) and at no fault by CONTRACTOR, subject to approval by COUNTY. COUNTY will review the request and determine in its sole discretion whether the situation warrant a time extension at no-cost or with costs. If CONTRACTOR completes the Task Order beyond the stipulated completion date without COUNTY’s specific written approval for time extension, CONTRACTOR will be subject to liquidated damages and may be construed as non-responsive, which may affect CONTRACTOR for considerations for future Task Orders or projects.

  • Term Extension It is understood and agreed that the State may extend the Term an additional period of time, not to exceed one hundred-eighty (180) days beyond the expiration date of this Grant Contract, under the same terms and conditions. In no event, however, shall the maximum Term, including all extensions or renewals, exceed a total of sixty (60) months.

  • TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION (i) The work under this Contract shall commence within seven (7) calendar days of receipt of Notice to Proceed and will be substantially complete within thirty (80) calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions and completed and ready for final payment within ninety (90) calendar days after the date when the Contract Time commences to run.

  • Construction Commencement The Connecting Transmission Owner shall commence construction of the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades for which it is responsible as soon as practicable after the following additional conditions are satisfied:

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!