TENSIONING SYSTEM. RISER TENSIONERS Make: NOV - Hydralift Quantity: 10 singles Stroke: 50ft Pressure Rating: 3,000 psi Tension Capacity: 250 Kips ea, 2,500 Kips total Wire size: 2-7/8” Sheave ID/OD: 82” / 90” Idler Sheave: 84” MARINE DRILLING RISER SYSTEM Make: Dril-Quip Type: FRC 2.5 Million LB Rating 75’length Quantity & size: 78 ea. joints 21” x .625 wall x 75’ Fitted with buoyancy. 1 ea. joint 21”x .625 wall x75’slick 23 ea joints 21”X.750 wall X 75’ Fitted with buoyancy. 11 ea. Joints 21”x .750 wall x 75’ slick 1 ea. pup joint 21”x .750 wall x 50’ slick 1 ea. pup joint 21”x .750 wall x 40’ slick 1 ea pup joint 21” x .750 wall x 25’ slick 1 ea pup joint 21” x .750 wall x 15’ slick 1 ea boost joint 21” x .750 wall x 7’ slick 1 ea 65’ stroke Telescopic joint with split termination ring
AutoNDA by SimpleDocs

Related to TENSIONING SYSTEM

  • Commissioning preparation of a system or systems to allow hydrocarbons or other process fluids to be safely introduced into the system or systems for processing. In this phase testing will focus on systems, including utilities.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Installation Tenant may install and use Tenant's Lines and make connections and disconnections at the terminal blocks as described above, provided Tenant shall: (i) obtain Landlord's prior written approval of all aspects thereof, (ii) use an experienced and qualified contractor designated or approved in writing in advance by Landlord (whom Landlord may require to enter an access and indemnity agreement on Landlord's then standard form of agreement therefor), (iii) comply with such inside wire standards as Landlord may adopt from time to time, and all other provisions of this Lease, including Paragraph 8 respecting alterations, and the Building rules respecting access to the wire closets, (iv) not install Lines in the same sleeve, chaseway or other enclosure in close proximity with electrical wire, and not install PVC-coated Lines under any circumstances, (v) thoroughly test any riser Lines to which Tenant intends to connect any Lines to ensure that such riser Lines are available and are not then connected to or used for telephone, data transmission or any other purpose by any other party (whether or not Landlord has previously approved such connections), and not connect to any such unavailable or connected riser Lines, and (vi) not connect any equipment to the Lines which may create an electromagnetic field exceeding the normal insulation ratings of ordinary twisted pair riser cable or cause radiation higher than normal background radiation, unless the Lines therefor (including riser Lines) are appropriately insulated to prevent such excessive electromagnetic fields or radiation (and such insulation shall not be provided by the use of additional unused twisted pair Lines). As a condition to permitting installation of new Lines, Landlord may require that Tenant remove any existing Lines located in or serving the Premises.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).

  • Building Systems The term “Building Systems” means all systems serving the Building in general, including, but not limited to, the fire/life safety, electrical, plumbing, HVAC, including all components thereof and related equipment, but excluding any equipment that is separately installed by or on behalf of Tenant and any distribution systems or equipment existing within the Premises.

  • Hardware and Software Requirements In order to access and retain Disclosures electronically, you must satisfy the following computer hardware and software requirements: access to the Internet; an email account and related software capable of receiving email through the Internet; a web browser which is SSL-compliant and supports secure sessions, and hardware capable of running this software.

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Production Work Except as agreed to in writing by the Parties pursuant to the "Production Work" section of the Standard Online Commerce Terms & Conditions attached hereto as Exhibit F, MP will be responsible for all production work associated with the Affiliated MP Site, including all related costs and expenses.