TESTING AND COMMISSIONING OF SYSTEM. After the completion of Installation of the machines/Units and before closing of ceiling, pressure testing of the copper piping, Intermediate connections, Y- branching joints is carried out by using Nitrogen gas. • Apply test pressure in the system as per the OEM Requirement. • Pressure testing is done by holding the pressure for 24 hours and doing soap bubble test for any leakage at the joints. Removal of the insulation at the location of leakage detection. Post which brazing and other process is follow. • Vacuumization of entire VRF Refrigeration system. • Start Commissioning procedure for VRF unit as per OEM guidelines • Check for visual damage to the external casing of the unit or damage to the internal parts. • Confirm room is in a condition fit for commissioning to commence. Room cleaned and free of dust, secure with doors installed. • Start Commissioning procedure for VRF unit as per OEM guidelines • Release Refrigerant gas from outdoor unit. Charge additional refrigerant gas as per the copper pipe sizes and overall length. • Room wise temperature reading is prepared on hourly basis.
AutoNDA by SimpleDocs

Related to TESTING AND COMMISSIONING OF SYSTEM

  • TESTING AND COMMISSIONING 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Protocol No action to coerce or censor or penalize any negotiation participant shall be made or implied by any other member as a result of participation in the negotiation process.

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • OFFICE OF MANAGEMENT AND BUDGET (OMB) AUDIT REQUIREMENTS The parties shall comply with the requirements of the Single Audit Act of 1984, P.L. 98-502, ensuring that the single audit report includes the coverage stipulated in 2 CFR 200.