Building Commissioning Services. The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.
Building Commissioning Services. CM/GC Cost Responsibilities.
Building Commissioning Services. CMR Cost Responsibilities.
Building Commissioning Services. The Owner may provide either through: (i) a separate contract, (ii) as an additional service of the Design Professional, or (iii) as a separate contract issued by the Using Agency, the Building Commissioning services involving the project‟s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). It is the intent of this Section that the Commissioning Authority engaged for this Project enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to Material Completion.
Building Commissioning Services. The Board may provide either through: (i) a separate contract, (ii) as an additional service of the Design Professional, (iii) Component Change Order to the CMR, or (iv) as a separate contract issued by the Board, the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable) and other services. It is the intent of this Section that the Commissioning Authority engaged for this Project enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to Material Completion.
Building Commissioning Services. For the purpose of this Paragraph 4.2.4.E., the School District adopts the following definition of “commissioning” as “the quality process for achieving, validating and documenting the performance systems, sub systems and equipment to meet the basis of design and preparing facility personnel for maintenance and operation”.
1. The Construction Manager shall oversee installation of building systems and equipment.
2. The Construction Manager shall manage and facilitate the implementation of all commissioning processes and guidelines throughout the duration of the Project.
3. The Construction Manager shall ensure that all equipment and facility inventory information is inputted into the School District facilities inventory database.
4. The Construction Manager shall ensure that work by other School District departments is coordinated with the work of the Construction Contractors.
5. The Construction Manager shall ensure that the Construction Contractors are maintaining progressive as-built construction drawings. The Construction Manager shall review the final as-built construction drawings, and ensure that the final as-builts construction drawings are submitted to the appropriate School District representative.
6. The Construction Manager shall verify the Construction Contractors’ punch lists. The Construction Manager shall ensure that the Construction Contractors’ punch lists are entered into the approved project management program. The Construction Manager shall conduct substantial completion inspections with the School District and the Design Consultant. The Construction Manager shall issue Notices of Substantial Completion. The Construction Manager shall conduct final inspections with School District staff.
7. The Construction Manager shall coordinate between School District staff and the Construction Contractors for training sessions. The Construction Manager shall monitor all required demonstration and training of School District personnel.
8. The Construction Manager shall attend the Turnover meeting with the School District and the Construction Contractors.
Building Commissioning Services. Building Commissioning Services shall be provided in accordance with Section 2.3 of the Design Standards. The [ ] in-house commissioning model [X] third party commissioning model will be utilized and is included in the scope of Design Services under this Contract. When Princeton University elects to use the third-party commissioning model, the Design Builder shall coordinate its services with Princeton University’s consultant pursuant to Part IV Section A paragraph (d).
Building Commissioning Services. Permitting Fee’s.
Building Commissioning Services. The Board may provide either through: (i) a separate contract,
Building Commissioning Services. The Owner may provide the Building Commissioning services involving the project‟s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). It is the intent of this Section that the Commissioning Authority engaged for this Project enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to Material Completion.