The Carbon4PUR project Sample Clauses

The Carbon4PUR project. Carbon4PUR aims at turning industrial waste gases (byproduct exhaust gas streams and flue gas streams of steel industry / mixed carbon monoxide (CO) / carbon dioxide (CO2) / CO/CO2 streams) into intermediates for polyurethane plastics for rigid foams/building insulation and coatings. The industrially driven, multidisciplinary consortium is developing a novel process based on direct chemical flue gas mixture conversion, avoiding expensive physical separation, thus substantially reducing the carbon footprint, and also contributing to high monetary savings. The interdisciplinary consortium consists of 14 partners from seven European countries (Germany, France, Belgium, The Netherlands, Greece, Switzerland and United Kingdom) and across sectors: four industries (Covestro Deutschland AG – short: COV, Recticel N.V. – short: Recticel, Viomichania Ritinon Megaron Xxxxxxxxxx Xxxxx Anonymos Etairia – short: Megara, ArcelorMittal – short: AMMR), five universities (Universiteit Gent – short: UGent, Universiteit Leiden – short: UL, Technische Universität Berlin – short: TUB, Rheinisch-westfälische technische Hochschule Aachen – short: RWTH, Imperial College of Science Technology and Medicine – short: ICL), one association (Dechema Gesellschaft fuer chemische Technik und Biotechnologie e.V. – short: Dechema), one research organization (Commissariat à l’énergie atomique et aux énergies alternatives – short: CEA), two service providers (PNO Consultants BV – short: PNO, South Pole Carbon Asset Management Ltd. – short: SPG) and the Grand Port Maritime de Marseille-Fos (short: MFPA). Both the consortium and the work are organized along the full value chain starting with the provision and conditioning of industrial emissions from a steel (AMMR, UGent) to a chemical company (COV) in line with the concept of industrial symbiosis exemplarily at Marseille Fos, going through the transformation into chemical building blocks (CEA, RWTH and COV), which both will be further transformed into polymer intermediates (RWTH, COV) and flow into desired sustainable polyurethane applications of rigid foams and coatings (Recticel, Megara). Life Cycle Assessment (LCA) and technology evaluation will be done (UL, RWTH, TUB, SPG) and replication strategies to transfer the technology to other applications will be elaborated (Dechema, PNO, ICL). The distinctive feature of the developed process is avoiding resource-intense separation of the gas components before the synthesis, and developing a chemo-c...
AutoNDA by SimpleDocs

Related to The Carbon4PUR project

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • The Project The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Projects There shall be a thirty (30) km free zone around the projects excluding the Metro Vancouver Area. For local residents, kilometers shall be paid from the boundary of the free zone around the project. Workers employed by any contractor within an identified free zone who resides outside of that same free zone will be paid according to the Kilometer Chart from the project to their residence less thirty

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Fabrication Making up data or results and recording or reporting them.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!