Escorting Visitors Visitors to areas where PHI COUNTY discloses to 4 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY is 5 contained shall be escorted and such PHI shall be kept out of sight while visitors are in the area.
Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
PROPOSED MOBILITY PROGRAMME The proposed mobility programme includes the indicative start and end months of the agreed study programme that the student will carry out abroad. The Learning Agreement must include all the educational components to be carried out by the student at the receiving institution (in table A) and it must contain as well the group of educational components that will be replaced in his/her degree by the sending institution (in table B) upon successful completion of the study programme abroad. Additional rows can be added as needed to tables A and B. Additional columns can also be added, for example, to specify the study cycle-level of the educational component. The presentation of this document may also be adapted by the institutions according to their specific needs. However, in every case, the two tables A and B must be kept separated, i.e. they cannot be merged. The objective is to make clear that there needs to be no one to one correspondence between the courses followed abroad and the ones replaced at the sending institutions. The aim is rather that a group of learning outcomes achieved abroad replaces a group of learning outcomes at the sending institution, without having a one to one correspondence between particular modules or courses. A normal academic year of full-time study is normally made up of educational components totalling 60 ECTS* credits. It is recommended that for mobility periods shorter than a full academic year, the educational components selected should equate to a roughly proportionate number of credits. In case the student follows additional educational components beyond those required for his/her degree programme, these additional credits must also be listed in the study programme outlined in table A. When mobility windows are embedded in the curriculum, it will be enough to fill in table B with a single line as described below: Component code (if any) Component title (as indicated in the course catalogue) at the sending institution Semester [autumn / spring] [or term] Number of ECTS* credits Mobility window … Total: 30 Otherwise, the group of components will be included in Table B as follows: Component code (if any) Component title (as indicated in the course catalogue) at the sending institution Semester [autumn / spring] [or term] Number of ECTS* credits Course x … 10 Module y … 10 Laboratory work … 10 Total: 30 The sending institution must fully recognise the number of ECTS* credits contained in table A if there are no changes to the study programme abroad and the student successfully completes it. Any exception to this rule should be clearly stated in an annex of the Learning Agreement and agreed by all parties. Example of justification for non-recognition: the student has already accumulated the number of credits required for his/her degree and does not need some of the credits gained abroad. Since the recognition will be granted to a group of components and it does not need to be based on a one to one correspondence between single educational components, the sending institution must foresee which provisions will apply if the student does not successfully complete some of the educational components from his study programme abroad. A web link towards these provisions should be provided in the Learning Agreement. The student will commit to reach a certain level of language competence in the main language of instruction by the start of the study period. The level of the student will be assessed after his/her selection with the Erasmus+ online assessment tool when available (the results will be sent to the sending institution) or else by any other mean to be decided by the sending institution. A recommended level has been agreed between the sending and receiving institutions in the inter-institutional agreement. In case the student would not already have this level when he/she signs the Learning Agreement, he/she commits to reach it with the support to be provided by the sending or receiving institution (either with courses that can be funded by the organisational support grant or with the Erasmus+ online tutored courses). All parties must sign the document; however, it is not compulsory to circulate papers with original signatures, scanned copies of signatures or digital signatures may be accepted, depending on the national legislation. * In countries where the "ECTS" system it is not in place, in particular for institutions located in partner countries not participating in the Bologna process, "ECTS" needs to be replaced in all tables by the name of the equivalent system that is used and a weblink to an explanation to the system should be added. The section to be completed during the mobility is needed only if changes have to be introduced into the original Learning Agreement. In that case, the section to be completed before the mobility should be kept unchanged and changes should be described in this section. Changes to the mobility study programme should be exceptional, as the three parties have already agreed on a group of educational components that will be taken abroad, in the light of the course catalogue that the receiving institution has committed to publish well in advance of the mobility periods and to update regularly as ECHE holder. However, introducing changes might be unavoidable due to, for example, timetable conflicts. Other reasons for a change can be the request for an extension of the duration of the mobility programme abroad. Such a request can be made by the student at the latest one month before the foreseen end date. These changes to the mobility study programme should be agreed by all parties within four to seven weeks (after the start of each semester). Any party can request changes within the first two to five-week period after regular classes/educational components have started for a given semester. The exact deadline has to be decided by the institutions. The shorter the planned mobility period, the shorter should be the window for changes. All these changes have to be agreed by the three parties within a two-week period following the request. In case of changes due to an extension of the duration of the mobility period, changes should be made as timely as possible as well. Changes to the study programme abroad should be listed in table C and, once they are agreed by all parties, the sending institution commits to fully recognise the number of ECTS credits as presented in table C. Any exception to this rule should be documented in an annex of the Learning Agreement and agreed by all parties. Only if the changes described in table C affect the group of educational components in the student's degree (table B) that will be replaced at the sending institution upon successful completion of the study programme abroad, a revised version should be inserted and labelled as "Table D: Revised group of educational components in the student's degree that will be replaced at sending institution". Additional rows and columns can be added as needed to tables C and D. All parties must confirm that the proposed amendments to the Learning Agreement are approved. For this specific section, original or scanned signatures are not mandatory and an approval by email may be enough. The procedure has to be decided by the sending institution, depending on the national legislation.
Your Billing Rights: Keep this Document for Future Use This notice tells you about your rights and our responsibilities under the Fair Credit Billing Act.
Agreement Exceptions/Deviations Explanation If the proposing Vendor desires to deviate form the Vendor Agreement language, all such deviations must be listed on this attribute, with complete and detailed conditions and information included. TIPS will consider any deviations in its proposal award decisions, and TIPS reserves the right to accept or reject any proposal based upon any deviations indicated below. In the absence of any deviation entry on this attribute, the proposer assures TIPS of their full compliance with the Vendor Agreement.
Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.
Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner [shall/shall not] transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.
Minimum Shipping Requirements for TIPS Sales Vendor shall ship, deliver, or provide ordered goods and services within a commercially reasonable time after acceptance of the order. If a delay in delivery is anticipated, Vendor shall notify the TIPS Member as to why delivery is delayed and provide an updated estimated time for completion. The TIPS Member may cancel the order if the delay is not commercially acceptable or not consistent with the Supplemental Agreement applicable to the order.
Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.
Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.