Timber Shuttering Sample Clauses

Timber Shuttering. Formwork for exposed work shall be of seasoned wrought hard wood timber planks free from loose knots. The planks shall be 50 mm thick, 100 to 125 mm wide with tongue and groove joints, assembled to a pattern approved by the Architect. The formwork shall be so constructed, braced, and stayed as to remain absolutely rigid and true during and after concreting. The boards shall be planed to a suitable thickness in order that the surface against the concrete shall not be broken at joints between boards. Chamfers, grooves, drips mouldings, bevelled edges etc. shall be made in the form itself to the size, profiles and details called for on the drawings.
AutoNDA by SimpleDocs

Related to Timber Shuttering

  • Glazing All new and replacement exterior windows shall have sealed, low emmissivity, insulating glass units which are manufactured by members of SIGMA and IGCC. Sealed insulating glass shall meet ASTM E774, class B. Glass shall be hermetically dual sealed, inert gas filled, double pane units with exterior 3/16” bronze float glass (IoE second surface), ½” air space, and interior 3/16” clear float glass. Insulated panels, if used, shall be 1” laminated panels equal to Xxxxx Industries architectural panels with a porcelain fused-on finish. Wired or clear fire-rated glass shall be UL approved. Safety glass shall be tempered or laminated, and shall meet ANSI 297.1 standard.

  • Load Shedding The Distributor may carry out Load Shedding in the following circumstances:

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Hazing Hazing is a process, based on tradition that is used by groups to maintain a hierarchy (i.e., a pecking order) within the group. Regardless of consent, the rituals require individuals to engage in activities that are physically and/or psychologically stressful. These activities can be humiliating, demeaning, intimidating, and exhausting, all of which results in physical or emotional discomfort. Hazing is about group dynamics and proving one’s worthiness to become a member of a specific group. The newcomer, or victim, is hazed. Once accepted by the group, the victim may become a bystander, watch others get hazed, achieve senior status, and ultimately become a perpetrator of hazing. In New Jersey, hazing is a separate criminal offense under N.J.S.A. 2C:40-3. School officials should be aware that hazing which involves the participation of a coach or a teacher may also constitute child abuse. Hazing may also involve other predicate crimes, such as sexual assault. Hazing may also constitute HIB. As noted in Article 4.4.2, although HIB is not a separately defined criminal offense, the conduct that constitutes bullying may constitute one or more criminal or disorderly person offenses, including assault, harassment, threats, robbery and sexual offenses.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Filtering Company may employ various filtering methods to reduce unwanted content, such as SPAM e-mail, from reaching Your Company Account. You acknowledge and agree that such methods may prevent legitimate content from reaching Your Account and that Company will not be liable therefor.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Toilets Papers, dust, cobwebs, peels, cans/bottles, cigarette butts, excrement on floor, bad smells, water pools, leaking sewage, rodents, animals (dead or alive), overflowing sanitary bins. 0 = NOT APPLICABLE 1 = UNACCEPTABLE (Toilets out of order. Toilets not cleaned on daily basis.) 2 = POOR (Toilets cleaned, but still visible signs of dirt, e.g. dust, cobwebs.) 3 = GOOD (Obvious sign that toilets are cleaned daily.) 4 = EXCELLENT (Extra effort is put in to ensure cleanliness, e.g. using detergents.)

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

Time is Money Join Law Insider Premium to draft better contracts faster.