Tippler take out conveyors. The Contractor disconnects the conveyor (00EAB21) motor (02EAB21AF100 – M01 and 02EAB21AF100 – M02) from the 6,6kV Coal Stockyard Board 3 circuits 03BCC05AA001 and 03BCC06AA001 located in the Tippler Substation. The Contractor disconnects the conveyor (00EAB22) motors (02EAB22AF100–M01 and 02EAB22AF100–M02) from the 6,6kV Coal Stockyard Board 4 circuits 04BCC04AA001 and 04BCC05AA001 located in the Tippler Substation. The two circuit breakers from panel 7&8 in 6.6 kV Coal Stockyard board 3&4 circuit breakers must be used to supply the ring as per the drawing 0.66/98063 Sheet 1. The Contractor retrofits all necessities to make the protection scheme function as transformer feeder scheme. The Contractor disconnects the existing coal bin feed conveyor 11 (00EAC11AF100) and coal bin feed conveyor 22 (2EAB22AF100) motors in order to create circuits for the new 630 kW conveyors 00EAB21 and 00EAB22. The conveyors (00EAB21) and (00EAB22) to be disconnected from 6,6kV Coal Stockyard Board 3&4 above are to be reconnected in 01BCC06 and 02BCC06 respectively. The Contractor is responsible to make these circuits functional as motor DOL scheme for 630 kW DOL as per the Eskom standard 240-56357424. It is the responsibility of the Contractor to make sure that circuits 01BCC06 of 6.6kV Coal Stockyard board 1 and 02BCC06 of 6.6kV Coal Stockyard Board 2 are compatible with the new operations and control of the 630kW take out conveyor motors. It is the responsibility of the Contractor to test and terminate the new take out conveyor motors at the new location (new transfer house). The Contractor assesses all the electrical installation in the tippler pit and take-out conveyor tunnel. The Contractor allows for the replacement all of electrical installation. This must be take-out item in the activity schedule.
AutoNDA by SimpleDocs
Tippler take out conveyors a. The list of protection devices supplied and installed on the extended tippler take-out conveyors as part of the Works includes:

Related to Tippler take out conveyors

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Transit Traffic The following rates will apply:

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

Time is Money Join Law Insider Premium to draft better contracts faster.