EXTENT OF THE WORKS. The installation of air condition to be performed and executed shall include, but not be limited to, all the items listed in the schedules below under each heading. These action and findings shall be logged and be reported to the department for assessment as to be carried out under provisional funding.
EXTENT OF THE WORKS. The description of the work contained in the Extent of Work is merely an outline of the work to be executed in terms of the contract and shall not limit the work to be carried out by the Contractor. Estimated quantities of each type of work to be carried out are listed in the Bill of Quantities. The planned rehabilitation and construction measures are shown on the construction drawings. The Works included in this contract will mainly consist of the works described in the sub-sections below:
EXTENT OF THE WORKS. The scope of the principal contract includes the following activities:
EXTENT OF THE WORKS. The scope of Works includes the detailed design, engineering, drawings, procurement, manufacture, quality control & assurance, supply, delivery, installation, commissioning, testing, handing over, and maintenance during the guarantee period of all materials and equipment necessary for the complete Control and Instrumentation scope at Majuba Power Station. The Contractor reads this Works Information in conjunction with the rest of this contract in its entirety, including tender drawings and standards. In addition to the requirements stated herein, the Contractor: Provides for all actuators and drives as per Annexure B “Drive and Actuator Schedule”. Provides for all instrumentation as per Annexure B “Instrument Schedule”. Provides for all interfaces as per Annexure B “IO Function Block Diagram”. Provides all plant, materials and services as shown in Annexure B “Limits of Supply and Services”. Provides for all interfaces as per Annexure B “Panel Interface List”. Provides all signals in Annexure B “Virtual Signal List”. The Contractor amends any of the above appendices, where necessary (to assign responsibilities based on the Contractor’s sub-contracting strategy etc…), where an error or omission has been made by the Employer, or to cater for the Contractor’s design, to fulfil the requirements of the Works and submits the appendices to the Project Manager for approval. The Contractor adopts the above appendices as templates for the Works. All submissions of these appendices conform to these templates. Furthermore, the following templates are adopted and conformed to for the Works: DCS Termination Schedules and IO lists (see Annexure B ABB and LLP Terminations) Junction box Termination Schedules (see Annexure B 520SH1-2) Fire detection system loop drawings (see Annexure B 0.66 99032 Rev.2_Fire Detection Overland Conveyor - Zone 6 - As Built) Fire detection system layout drawings (see Annexure B 57718 - Aux Bay U1 16m & 13.8m Level ) Long line protection system drawings (see Annexure B 00ECA21_Reclaim)
EXTENT OF THE WORKS. The Service and maintenance work to be performed and executed shall include, all the items listed in the scope of works.
EXTENT OF THE WORKS. The Works include, unless otherwise specified, the supply, installation, testing and commissioning, and delivery up clean and in working order of the installations shown on the Drawings and specified in the Specifications, including all details such as:- Cold and hot water pipes, discharge pipes (the term discharge pipe is used as a comprehensive all-embracing description in place of the traditional soil and waste terms), drain and ventilating pipes, valves, fire fighting installations and equipment, thermal insulation, etc., and all labour, materials, tools, instruments and scaffolding necessary to execute the work in a first-class manner. The Contractor shall undertake all modifications demanded by the Authorities in order to comply with the current regulations and produce all certificates, if any, from the Authorities without extra charge.
EXTENT OF THE WORKS. The routine maintenance work to be performed as part of this Contract mainly consists of the activities listed below to be carried out on all Major and District surfaced and unsurfaced roads in the LMA. Additional works to minor roads will only be carried out upon specific request from the Client. This list is not necessarily complete nor will it limit the extent of work to be carried out under this Contract.
EXTENT OF THE WORKS. The three projects have been clustered as indicated in the Locality Map and Schedule attached as and approximate number of guidance, regulatory and warning signs that are currently located along each route. Please note that this is the total number of signs along the route, and not necessarily the number of signs that need to be replaced or new signs to be installed. The Employer also reserves the right to selected additional routes, or remove/amend any of these routes from the scope of works for each project. Route No Section Section Length (km) Route Length (km) Approx No of Inter- sections Approx No of Signs R102 Zwelitsha to Highgate 50.0 50.0 29 301 225 R346 Stutterheim to R72 92.0 92.0 34 328 367 R345 Xxxxx (R63) to R351 75.0 75.0 23 450 188 R351 R67 to Cathcart 25.0 25.0 8 112 74 R352 Dimbaza R63 to Stutterheim 58.0 58.0 27 407 176 R330 Cape St Xxxxxxx to Humansdrp 24.0 52.0 7 155 74 Humansdorp to Hankey 28.0 53 118 71 R331 Andrieskraal to R102 60.0 60.0 21 322 165 R335 Addo to Somerset East 125.0 125.0 28 786 224 R336 R75 to Addo 48.0 48.0 20 227 251 R342 R335 to R72 58.0 58.0 22 158 197 R400 R75 to R350 152.0 152.0 14 249 240 R410 to R56 Indwe 23.4 7 118 3 R396 R56 Indwe to R58 Barkly East 96.7 344.2 27 215 19 R58 Barkly East to R56 Maclear 163.0 48 588 67 R56 Maclear to N2 61.1 20 79 64 R393 R726 to R58 Barkly Pass 145.0 145.0 30 352 33 R394 N2 to R61 Magusheni 33.6 33.6 7 37 5 R344 R350 to Adelaide 70.3 302.5 17 263 148 Adelaide to Tarkastad 100.2 17 349 117 Tarkastad to Sterkstroom 71.9 11 265 116 Sterkstroom to R56 60.1 20 166 108
EXTENT OF THE WORKS. The works consists of the supply and installation of the following: Zero depth water feature Reinforced concrete water feature with a polished finish and two types of fountain nozzles. Pond Multi-leveled reinforced concrete pond with granite weirs.
EXTENT OF THE WORKS. The works includes the Construction of 2 x 4 Classroom Block, 2 x Grade R Facilities, 1 x Medium Admin Block, 4 seats waterborne toilets, Septic Tank, Steel Palisade Fence.12 Additional enviroloos. Refurbishment of 4 Classrooms, Borehole and Provision of 30kl Water Storage Tanks. Demolition of 10 classrooms and 3 pit toilets