To Surface Sample Clauses

To Surface. During the Research Term and Evaluation Term for each Target, Adimab hereby grants to Surface a non-exclusive, non-sublicensable license with respect to such Target, under the Adimab Platform Patents, Program Antibody Patents and Know-How Controlled by Adimab (or its Affiliates) during the term of this Agreement, to perform research, and to design, research, preclinically develop, make, import and use Program-Benefited Antibodies and Adimab Materials pertaining thereto in the Field, including for Surface to (i) evaluate Program-Benefited Antibodies, (ii) perform Permitted Comparisons and Surface’s responsibilities under the Research Plan and this Agreement for each Target, and (iii) design, research, preclinically develop, make, import and use Program-Benefited Antibodies and Adimab Materials as Adimab Diagnostic Products. For clarity, the license to Surface excludes the right to [***] but includes the right to (1) perform Permitted Comparisons and (2) have others perform the licensed activities on behalf of Surface.
AutoNDA by SimpleDocs
To Surface. During the Research Term and Evaluation Term for each Target, Adimab hereby grants to Surface a non-exclusive, non-sublicensable license with respect to such Target, under the Adimab Platform Patents, Program Antibody Patents and Know-How Controlled by Adimab (or its Affiliates) during the term of this Agreement, to perform research, and to design, research, preclinically develop, make, import and use Program-Benefited Antibodies and Adimab Materials pertaining thereto in the Field, including for Surface to evaluate Program-Benefited Antibodies and to perform Permitted Comparisons and Surface’s responsibilities under the Research Plan and this Agreement for each Target. For clarity, the license to Surface excludes the right to [***] but includes the right to (1) perform Permitted Comparisons and (2) have others have others perform the licensed activities on behalf of Surface.

Related to To Surface

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Use of Hazardous Materials Tenant shall not cause or permit any Hazardous Materials to be used, stored, discharged, released or disposed of in the Premises or cause any Hazardous Materials to be used, stored, discharged, released or disposed of in, from, under or about, the Property, or any other land or improvements in the vicinity of the Property, excepting only the types and minor quantities of Hazardous Materials which are normally used in connection with Tenant’s permitted use, operation and maintenance of the Premises and then only in strict accordance with all Legal Requirements, including all Environmental Laws (“Permitted Substances”). Tenant shall, at its own expense, procure, maintain in effect and comply with all conditions of any and all permits, licenses, and other governmental and regulatory approvals required for Tenant’s use of Hazardous Materials at the Premises, including, without limitation, discharge of appropriately treated materials or wastes into or through any sanitary sewer serving the Building. Tenant shall in all respects handle, treat, deal with and manage any and all Tenant’s Hazardous Materials in total conformity with all Environmental Laws and prudent industry practices regarding management of such Hazardous Materials. Without limiting the foregoing, if any Tenant’s Hazardous Materials result in contamination of the Building, or any soil or groundwater in, under or about the Property in each case to the extent the presence of same amounts to a violation of any Legal Requirement or poses a threat to human health or safety, Tenant, at its expense, shall promptly take all actions necessary to return the Building and/or the Property, to the condition existing prior to the appearance of the Tenant’s Hazardous Material, subject to Landlord’s right to approve Tenant’s proposed remediation method. On or prior to the Termination Date, Tenant shall cause all Tenant’s Hazardous Materials in, on, under or about the Building to be removed in accordance with and in compliance with all Legal Requirements. Tenant shall promptly notify Landlord and obtain Landlord’s written approval before taking any remedial action in response to the presence of any Tenant’s Hazardous Materials or entering into any settlement agreement, consent decree or other compromise with respect to any claims relating to Tenant’s Hazardous Materials.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • No Hazardous Materials (A) have been disposed of or otherwise released from any Real Property of the Company or any of its Subsidiaries in violation of any Environmental Laws; or (B) are present on, over, beneath, in or upon any Real Property or any portion thereof in quantities that would constitute a violation of any Environmental Laws. No prior use by the Company or any of its Subsidiaries of any Real Property has occurred that violates any Environmental Laws, which violation would have a material adverse effect on the business of the Company or any of its Subsidiaries.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!