Surface Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner. Blading shall not undercut the backslope or cut into geotextile fabric on the road. If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock. Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator. Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator. For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.
Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.
Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.
Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
Porcupine Site Highway 11
Compaction of surfaces 5 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density. m2 96
Horizontal Movement The Board encourages all unit members to improve their skills through advanced training and, as an inducement thereto, provides extra compensation for those who do so successfully. The Board delegates to the Superintendent the responsibility for assuring that unit members comply with the following regulations when claiming credit for advanced studies.
Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.
MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.
Common Area (Check one)