Training Plan. (i) CONTRACTOR shall develop a training plan in a format acceptable to DCAMM as part of Design Services. The training plan shall: include an adoption and utilization plan necessary to allow FACILITY to operate the New Equipment/Systems and all associated Existing Equipment/systems independently following the expiration of any service, maintenance, or warranty requirements of CONTRACTOR and to allow FACILITY to gain expertise in the New Equipment/Systems such to allow the FACILITY to gain the benefit of the Energy Savings for the expected useful life of the New Equipment/Systems; incorporate all applicable manufacturer training requirements and/or recommendations; set forth the specific training requirements for Subcontractors, including, but not limited to, the Designer; set forth the procedures for verification of utilization, including, but not limited to, sign-in sheets for all training sessions; require videotaping of training sessions to maximize usefulness to FACILITY and DCAMM; for each training session, specify the equipment included, intended audience, location, objectives, subjects covered, duration, instructor and qualifications, and methods (i.e. classroom lecture, video, site walkthrough, actual operational demonstrations, written handouts, etc.). This section shall not impose any additional liability for failures of the New Equipment/Systems after the Contract Term and any related service and/or warranty periods have expired that does not exist elsewhere in this Contract. (ii) CONTRACTOR shall submit a draft training plan prior as part of the 50% Design Deliverable for each ECM. CONTRACTOR shall incorporate any comments or requested changes provided by DCAMM into the draft training plan, which shall be provided to CONTRACTOR by DCAMM no later than thirty (30) days from submission of the draft training plan, and resubmit the training plan to DCAMM with the next Design Deliverable for the applicable ECM or at a time otherwise agreed by the Project Manager. CONTRACTOR must have DCAMM acceptance of the training plan prior to submission of the final Design Deliverable. Design Deliverables shall not be considered complete and CONTRACTOR may not commence Installation Services for any New Equipment/Systems without DCAMM’s written acceptance of the training plan.
Appears in 3 contracts
Samples: Energy Services Agreement, Energy Services Agreement, Energy Services Agreement
Training Plan. (i) CONTRACTOR shall develop a training plan in a format acceptable to DCAMM as part of Design Services. The training plan shall: include an adoption and utilization plan necessary to allow FACILITY to operate the New Equipment/Systems and all associated Existing Equipment/systems Systems independently following the expiration of any service, maintenance, or warranty requirements of CONTRACTOR and to allow FACILITY to gain expertise in the New Equipment/Systems such to allow the FACILITY to gain the benefit of the Energy Savings for the expected useful life of the New Equipment/Systems; incorporate all applicable manufacturer training requirements and/or recommendations; set forth the specific training requirements for Subcontractors, including, but not limited to, the Designer; set forth the procedures for verification of utilization, including, but not limited to, sign-in sheets for all training sessions; require videotaping of training sessions to maximize usefulness to FACILITY and DCAMM; for each training session, specify the equipment included, intended audience, location, objectives, subjects covered, duration, instructor and qualifications, and methods (i.e. classroom lecture, video, site walkthrough, actual operational demonstrations, written handouts, etc.). This section shall not impose any additional liability for failures of the New Equipment/Systems after the Contract Term and any related service and/or warranty periods have expired that does not exist elsewhere in this Contract. The training plan shall require at least the number of hours of training set forth in Schedule B-5: Scope of Services for each ECM, unless otherwise approved by DCAMM in writing.
(ii) CONTRACTOR shall submit a draft training plan prior as part of the 50% Design Deliverable for each ECM. CONTRACTOR shall incorporate any comments or requested changes provided by DCAMM into the draft training plan, which shall be provided to CONTRACTOR by DCAMM no later than thirty (30) days from submission of the draft training plan, and resubmit the training plan to DCAMM with the next Design Deliverable for the applicable ECM or at a time otherwise agreed by the Project Manager. CONTRACTOR must have DCAMM acceptance of the training plan prior to submission of the final Design Deliverable. Design Deliverables shall not be considered complete and CONTRACTOR may not commence Installation Services for any New Equipment/Systems without DCAMM’s written acceptance of the training plan.
Appears in 3 contracts
Samples: Energy Services Agreement, Energy Services Agreement, Energy Services Agreement