Trunk Group Architecture and Traffic Routing. The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows: 4.3.1 The Parties shall mutually agree to initially configure either a one (1)-way or two (2)-way trunk group as a direct transmission path through the Interconnection Point(s) specified in Schedule 2.1. CLEC shall specify the Digital Signal Level of the trunk facilities (e.g., DSO, DS1 or higher, where available) consistent with the forecasting requirements in Section 19.5.2. 4.3.2 CBT shall ensure that each Tandem connection permits the transport of traffic to all End Offices that sub-tend such Tandem to which transport is technically feasible. Each Party shall establish and maintain separate logical trunk groups connected to each CBT Tandem that serves, or is sub-tended by End Offices that serve, Customers within the Exchange Areas served by such Tandem Switches. Only those valid NXX codes served by an End Office may be accessed through a direct connection to that End Office.
Appears in 21 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Trunk Group Architecture and Traffic Routing. The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:
4.3.1 The Parties shall mutually agree to initially configure either a one (1)-way or two (2)-way trunk group as a direct transmission path through the Interconnection Point(s) specified in Schedule 2.1in
1. CLEC Sprint shall specify the Digital Signal Level of the trunk facilities (e.g., DSO, DS1 or higher, where available) consistent with the forecasting requirements in Section 19.5.2.
4.3.2 CBT shall ensure that each Tandem connection permits the transport of traffic to all End Offices that sub-tend such Tandem to which transport is technically feasible. Each Party shall establish and maintain separate logical trunk groups connected to each CBT Tandem that serves, or is sub-tended by End Offices that serve, Customers within the Exchange Areas served by such Tandem Switches. Only those valid NXX codes served by an End Office may be accessed through a direct connection to that End Office.
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
Trunk Group Architecture and Traffic Routing. The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:
4.3.1 The Parties shall mutually agree to initially configure either a one (1)-way or two (2)-way trunk group as a direct transmission path through the Interconnection Point(s) specified in Schedule 2.1. CLEC Intermedia shall specify the Digital Signal Level of the trunk facilities (e.g., DSODS0, DS1 or higher, where available) consistent with the forecasting requirements in Section 19.5.2.
4.3.2 CBT shall ensure that each Tandem connection permits the transport of traffic to all End Offices that sub-tend such Tandem to which transport is technically feasible. Each Party shall establish and maintain separate logical trunk groups connected to each CBT Tandem that serves, or is sub-tended by End Offices that serve, Customers within the Exchange Areas served by such Tandem Switches. Only those valid NXX codes served by an End Office may be accessed through a direct connection to that End Office.
Appears in 1 contract
Samples: Interconnection Agreement
Trunk Group Architecture and Traffic Routing. The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:
4.3.1 The Parties shall mutually agree to initially configure either a one (1)-way or two (2)-way trunk group as a direct transmission path through the Interconnection Point(s) specified in Schedule 2.1. CLEC ICG shall specify the Digital Signal Level of the trunk facilities (e.g., DSO, DS1 or higher, where available) consistent with the forecasting requirements in Section 19.5.2.
4.3.2 CBT shall ensure that each Tandem connection permits the transport of traffic to all End Offices that sub-tend such Tandem to which transport is technically feasible. Each Party shall establish and maintain separate logical trunk groups connected to each CBT Tandem that serves, or is sub-tended by End Offices that serve, Customers within the Exchange Areas served by such Tandem Switches. Only those valid NXX codes served by an End Office may be accessed through a direct connection to that End Office.
Appears in 1 contract
Samples: Interconnection Agreement
Trunk Group Architecture and Traffic Routing. The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:
4.3.1 The Parties shall mutually agree to initially configure either a one (1)-way or two (2)-way trunk group as a direct transmission path through the Interconnection Point(s) specified in Schedule 2.1. CLEC TELIGENT shall specify the Digital Signal Level of the trunk facilities (e.g., DSO, DS1 or higher, where available) consistent with the forecasting requirements in Section 19.5.2.
4.3.2 CBT shall ensure that each Tandem connection permits the transport of traffic to all End Offices that sub-tend such Tandem to which transport is technically feasible. Each Party shall establish and maintain separate logical trunk groups connected to each CBT Tandem that serves, or is sub-tended by End Offices that serve, Customers within the Exchange Areas served by such Tandem Switches. Only those valid NXX codes served by an End Office may be accessed through a direct connection to that End Office.
Appears in 1 contract
Samples: Interconnection Agreement
Trunk Group Architecture and Traffic Routing. The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:
4.3.1 The Parties shall mutually agree to initially configure either a one (1)-way 1)- way or two (2)-way trunk group as a direct transmission path through the Interconnection Point(s) specified in Schedule 2.1. CLEC Intermedia shall specify the Digital Signal Level of the trunk facilities (e.g., DSODS0, DS1 or higher, where available) consistent with the forecasting requirements in Section 19.5.2.
4.3.2 CBT shall ensure that each Tandem connection permits the transport of traffic to all End Offices that sub-tend such Tandem to which transport is technically feasible. Each Party shall establish and maintain separate logical trunk groups connected to each CBT Tandem that serves, or is sub-tended by End Offices that serve, Customers within the Exchange Areas served by such Tandem Switches. Only those valid NXX codes served by an End Office may be accessed through a direct connection to that End Office.
Appears in 1 contract
Samples: Interconnection Agreement
Trunk Group Architecture and Traffic Routing. The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:
4.3.1 The Parties shall mutually agree to initially configure either a one (1)-way or two (2)-way trunk group as a direct transmission path through the Interconnection Point(s) specified in Schedule 2.1. CLEC Frontier shall specify the Digital Signal Level of the trunk facilities (e.g., DSO, DS1 or higher, where available) consistent with the forecasting requirements in Section 19.5.2.
4.3.2 CBT shall ensure that each Tandem connection permits the transport of traffic to all End Offices that sub-tend such Tandem to which transport is technically feasible. Each Party shall establish and maintain separate logical trunk groups connected to each CBT Tandem that serves, or is sub-tended by End Offices that serve, Customers within the Exchange Areas served by such Tandem Switches. Only those valid NXX codes served by an End Office may be accessed through a direct connection to that End Office.
Appears in 1 contract
Samples: Interconnection Agreement
Trunk Group Architecture and Traffic Routing. The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:
4.3.1 The Parties shall mutually agree to initially configure either a one (1)-way or two (2)-way trunk group as a direct transmission path through the Interconnection Point(s) specified in Schedule 2.1. CLEC Adelphia shall specify the Digital Signal Level of the trunk facilities (e.g., DSODS0, DS1 or higher, where available) consistent with the forecasting requirements in Section 19.5.2.
4.3.2 CBT shall ensure that each Tandem connection permits the transport of traffic to all End Offices that sub-tend such Tandem to which transport is technically feasible. Each Party shall establish and maintain separate logical trunk groups connected to each CBT Tandem that serves, or is sub-tended by End Offices that serve, Customers within the Exchange Areas served by such Tandem Switches. Only those valid NXX codes served by an End Office may be accessed through a direct connection to that End Office.
Appears in 1 contract
Samples: Interconnection Agreement