Unit Trip Test Sample Clauses

Unit Trip Test. Tests shall demonstrate the ability of the Early Generation Facility or the Plant as the case may be to withstand the simultaneous disconnection from the KPLC System of the largest two (2) Units, operating at greater than ninety five per cent (95%) of the capacity demonstrated in each Unit's Capacity Demonstration Test, and to continue to operate in a safe manner. Each Unit shall demonstrate that it is Capable of re-synchronisation within thirty (30) minutes.
AutoNDA by SimpleDocs
Unit Trip Test. Tests shall demonstrate the ability of the Plant to withstand the simultaneous tripping of no less than fifty per cent (50%) of the installed Units and its ability to remain in a safe condition.
Unit Trip Test. Tests shall demonstrate the ability of the Early Generation Facility or a Plant, as the case may be, to withstand the simultaneous disconnection from the KPLC System of, for the First Plant and the Second Plant, the largest two (2) Units, and, for each of the Third Plant and the Fourth Plant, for the single largest Unit, operating at greater than ninety five per cent (95%) of the capacity demonstrated in each Unit’s Capacity Demonstration Test, and to continue to operate in a safe manner. Each Unit shall demonstrate that it is Capable of re-synchronisation within thirty (30) minutes.

Related to Unit Trip Test

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • TREE TRIMMING 16.1 Customer Agreements to provide Customer is responsible for tree trimming: Subject to any written agreement between a Customer and the Distributor, and any statutory provision, the Trader must ensure that each of its Customer Agreements provides that the Customer must comply with its obligations under the Electricity (Hazards from Trees) Regulations 2003 in respect of any trees that the Customer has an interest in that are near any line that forms part of the Network.

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Performance Testing (a) All performance tests of the Project, including any Initial Performance Test required in Section 2 of Appendix VIII, will be performed in accordance with the test procedures set forth in Appendix VIII (“Performance Test”), including additional procedures and protocols related to Performance Testing as mutually agreed between Buyer and Seller (“Test Procedures”). Seller shall bear all costs and receive all revenues, if applicable, associated with all Performance Tests. (b) After the Initial Delivery Date and during the Delivery Term, Buyer will have the right to conduct a Performance Test (“Buyer Performance Test”) no more than once a calendar year to demonstrate whether the Project is capable of delivering the Distribution Services at the Contract Capacity. Within 30 calendar days following a Buyer Performance Test, Seller will have the right to retest the Project with a Performance Test (“Seller Retest”). For the avoidance of doubt, the results of any Seller Retest will supersede the results of the preceding Buyer Performance Test. (i) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is capable of delivering Distribution Services at or above ninety-nine percent (99%) of the Initial Contract Capacity, the Contract Capacity will remain the Initial Contract Capacity; (ii) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is capable of delivering Distribution Services at more than or equal to eighty-five (85%) of the Initial Contract Capacity, but less than ninety-nine percent (99%) of the Initial Contract Capacity (“Testing Band”), the Contract Capacity will be automatically adjusted (upwards or downwards) to the capacity commensurate with the amount of Distribution Services the Project delivered during the Performance Test within the Testing Band. (iii) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is not capable of delivering Distribution Services of at least eighty-five percent (85%) of the Initial Contract Capacity, an Event of Default shall occur in accordance with Section 7.1(a)(viii).