Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.
Documentation Required The certificates and endorsements shall be received and approved by the District before Work commences. As an alternative, the Contractor may submit certified copies of any policy that includes the required endorsement language set forth herein.
Facility Requirements 1. Maintain wheelchair accessibility to program activities according to governing law, including the Americans With Disabilities Act (ADA), as applicable. 2. Provide service site(s) that will promote attainment of Contractor’s program objectives. Arrange the physical environment to support those activities. 3. Decrease program costs when possible by procuring items at no cost from County surplus stores and by accepting delivery of such items by County.
Documentation Requirements ODM shall pay the MCP after it receives sufficient documentation, as determined by ODM, detailing the MCP’s Ohio Medicaid-specific liability for the Annual Fee. The MCP shall provide documentation that includes the following: 1. Total premiums reported on IRS Form 8963;
Accessibility Requirements Under Tex. Gov’t Code Chapter 2054, Subchapter M, and implementing rules of the Texas Department of Information Resources, the System Agency must procure Products and services that comply with the Accessibility Standards when those Products are available in the commercial marketplace or when those Products are developed in response to a procurement solicitation. Accordingly, Grantee must provide electronic and information resources and associated Product documentation and technical support that comply with the Accessibility Standards.
Application Requirements This application shall contain, as a minimum, a sketch showing the location of proposed facilities; a description, sketch, manufacturer’s brochure, etc. of the proposed facilities; and a description of the operation proposed. (11-28-90) 101. -- 199. (RESERVED) 200. OPERATIONAL AGREEMENT.
Reportable Uses Require Consent The term "Hazardous Substance" as used in this Lease shall mean any product, substance, chemical, material or waste whose presence, nature, quantity and/or intensity of existence, use, manufacture, disposal, transportation, spill, release or effect, either by itself or in combination with other materials expected to be on the Premises, is either: (i) potentially injurious to the public health, safety or welfare, the environment, or the Premises; (ii) regulated or monitored by any governmental authority; or (iii) a basis for potential liability of Lessor to any governmental agency or third party under any applicable statute or common law theory. Hazardous Substance shall include, but not be limited to, hydrocarbons, petroleum, gasoline, crude oil or any products or by-products thereof. Lessee shall not engage in any activity in or about the Premises which constitutes a Reportable Use (as hereinafter defined) of Hazardous Substances without the express prior written consent of Lessor and compliance in a timely manner (at Lessee's sole cost and expense) with all Applicable Requirements (as defined in Paragraph 6.3). "Reportable Use" shall mean (i) the installation or use of any above or below ground storage tank, (ii) the generation, possession, storage, use, transportation, or disposal of a Hazardous Substance that requires a permit from, or with respect to which a report, notice, registration or business plan is required to be filed with, any governmental authority, and (iii) the presence in, on or about the Premises of a Hazardous Substance with respect to which any Applicable Laws require that a notice be given to persons entering or occupying the Premises or neighboring properties. Notwithstanding the foregoing, Lessee may, without Lessor's prior consent, but upon notice to Lessor and in compliance with all Applicable Requirements, use any ordinary and customary materials reasonably required to be used by Lessee in the normal course of the Permitted Use, so long as such use is not a Reportable Use and does not expose the Premises or neighboring properties to any meaningful risk of contamination or damage or expose Lessor to any liability therefor. In addition, Lessor may (but without any obligation to do so) condition its consent to any Reportable Use of any Hazardous Substance by Lessee upon Lessee's giving Lessor such additional assurances as Lessor, in its reasonable discretion, deems necessary to protect itself, the public, the Premises and the environment against damage, contamination or injury and/or liability therefor, including but not limited to the installation (and, at Lessor's option, removal on or before Lease expiration or earlier termination) of reasonably necessary protective modifications to the Premises (such as concrete encasements) and/or the deposit of an additional Security Deposit under Paragraph 5 hereof.
Installation requirements We (if we install the System) or our contractor (if we procure a contractor to install the System) must:
Access Requirements You will be responsible for providing the System to enable you to use an Electronic Service.
Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.