Xxxxxxxxxx and Shutdown of the Network Controller. 1. If it is necessary to restart the N.C., you can press the small black button on the rear of the N.C. next to the plug for the monitor. (In the 5200 and 5300 series, unplug the power). This procedure is not recommended, since some data changes made within the last hour may be lost. A graceful shutdown is preferred if you have a monitor and keyboard connected to the N.C. To do a graceful shutdown, follow these steps:
AutoNDA by SimpleDocs

Related to Xxxxxxxxxx and Shutdown of the Network Controller

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Data Controller The Sponsor shall be the data controller for such personal data except that, if Quintiles deals with any personal data under this Agreement in the manner of a data controller, Quintiles shall be the data controller of such personal data to the extent of such dealings. Quintiles may process "personal data", as defined in the applicable data protection legislation enacted under the same or equivalent/similar national legislation (collectively "Data Protection Legislation"), of the Investigator and Study Staff for study-related purposes and all such processing will be carried out in accordance with the Data Protection Legislation. 6.4

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Data Input Control It will be possible to retrospectively examine and establish whether and by whom Personal Data have been entered, modified or removed from SAP data processing systems. Measures: • SAP only allows authorized personnel to access Personal Data as required in the course of their duty. • SAP has implemented a logging system for input, modification and deletion, or blocking of Personal Data by SAP or its subprocessors within the Cloud Service to the extent technically possible.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Verizon Operations Support Systems Verizon systems for pre- ordering, ordering, provisioning, maintenance and repair, and billing.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins