Initial Delivery Date has the meaning set forth in Section 1.1(d).
Firm Transmission Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part II, section 19.3 and Tariff, Part III, section 32.3.
Locational Deliverability Area or “LDA” shall mean a geographic area within the PJM Region that has limited transmission capability to import capacity to satisfy such area’s reliability requirement, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, and as specified in Reliability Assurance Agreement, Schedule 10.1.
Final Delivery Date means the date the Supplier is entitled to deliver the Products form the Purchaser even if the Products have not been called off as agreed in any Sales Agreement.
Contractual Delivery Date means the stipulated date on which the contractor shall attain
Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.
Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.
Registrant Fax Ext 4321 Registrant Email: XXXXX@XXXXXXX.XXX Admin ID: 5372809-ERL Admin Name: EXAMPLE REGISTRANT ADMINISTRATIVE Admin Organization: EXAMPLE REGISTRANT ORGANIZATION Admin Street: 000 XXXXXXX XXXXXX Xxxxx Xxxx: ANYTOWN Admin State/Province: AP Admin Postal Code: A1A1A1 Admin Country: EX Admin Phone: +1.0000000000 Admin Phone Ext: 1234 Admin Fax: +1.5555551213 Admin Fax Ext: Admin Email: XXXXX@XXXXXXX.XXX Tech ID: 5372811-ERL Tech Name: EXAMPLE REGISTRAR TECHNICAL Tech Organization: EXAMPLE REGISTRAR LLC Tech Street: 000 XXXXXXX XXXXXX Xxxx Xxxx: ANYTOWN Tech State/Province: AP Tech Postal Code: A1A1A1 Tech Country: EX Tech Phone: +1.1235551234 Tech Phone Ext: 1234 Tech Fax: +1.5555551213 Tech Fax Ext: 93 Tech Email: XXXXX@XXXXXXX.XXX Name Server: NS01.EXAMPLEREGISTRAR.TLD Name Server: NS02.EXAMPLEREGISTRAR.TLD DNSSEC: signedDelegation DNSSEC: unsigned >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Query format: whois “registrar Example Registrar, Inc.” Response format: Registrar Name: Example Registrar, Inc. Street: 0000 Xxxxxxxxx Xxx City: Marina del Rey State/Province: CA Postal Code: 90292 Country: US Phone Number: +1.0000000000 Fax Number: +1.3105551213 Email: xxxxxxxxx@xxxxxxx.xxx WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxx Registrar Phone Number: +1.3105551213 Fax Number: +1.3105551213 Email: xxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxxx Registrar Phone Number: +1.3105551214 Fax Number: +1.3105551213 Email: xxxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Technical Contact: Xxxx Geek Phone Number: +1.3105551215 Fax Number: +1.3105551216 Email: xxxxxxxx@xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Query format: whois “NS1.EXAMPLE.TLD”, whois “nameserver (nameserver name)”, or whois “nameserver (IP Address)” Server Name: NS1.EXAMPLE.TLD IP Address: 192.0.2.123 IP Address: 2001:0DB8::1 Registrar: Example Registrar, Inc. WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< The format of the following data fields: domain status, individual and organizational names, xxxxxxx, xxxxxx, xxxx, xxxxx/xxxxxxxx, postal code, country, telephone and fax numbers (the extension will be provided as a separate field as shown above), email addresses, date and times should conform to the mappings specified in EPP RFCs 5730-5734 so that the display of this information (or values return in WHOIS responses) can be uniformly processed and understood. In order to be compatible with ICANN’s common interface for WHOIS (InterNIC), WHOIS output shall be in the format outline above.
Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].
Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.
Batch Load Demand Resource means a Demand Resource that has a cyclical production process such that at most times during the process it is consuming energy, but at consistent regular intervals, ordinarily for periods of less than ten minutes, it reduces its consumption of energy for its production processes to minimal or zero megawatts.
Delivery Period Expiry Date “Downgraded Facility”, “Downgrade Event”, “Equipment Notes”, “Fee Letter”, “Final Legal Distribution Date”, “Financing Agreement”, “Investment Earnings”, “Liquidity Facility”, “Liquidity Obligations”, “Loan Trustee”, “Non-Extended Facility”, “Note Purchase Agreement”, “Operative Agreements”, “Participation Agreement”, “Performing Equipment Note”, “Person”, “Pool Balance”, “Rating Agencies”, “Regular Distribution Date”, “Replacement Liquidity Facility”, “Responsible Officer”, “Scheduled Payment”, “Special Payment”, “Stated Interest Rate”, “Subordination Agent”, “Taxes”, “Threshold Rating”, “Transfer”, “Trust Agreement”, “Trustee”, “Underwriters”, and “Underwriting Agreement”.
Instantaneous flow measurement means the flow measured during the minimum time required for the flow-measuring device or method to produce a result in that instance. To the extent practical, instantaneous flow measurements coincide with the collection of any grab samples required for the same sampling period so that together the samples and flow are representative of the discharge during that sampling period.
Sales assessment ratio studies means sales assessment ratio studies
Expedited Deliverability Study means a deliverability study that an eligible Developer may elect to pursue as that term is defined in OATT Section 25 (OATT Attachment S) that may determine the extent to which an existing or proposed facility satisfies the NYISO Deliverability Interconnection Standard at its requested CRIS level without the need for System Deliverability Upgrades. The schedule and scope of the study is defined in Sections 25.5.9.2.1 and 25.7.1.2 of this Attachment S.
Calling Name Delivery Service (CNDS) means a service that enables a terminating End User to identify the calling Party by a displayed name before a call is answered. The calling Party’s name is retrieved from a calling name database and delivered to the End User’s premise between the first and second ring for display on compatible End User premises equipment.
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.
Commercial Launch means the initial First Commercial Sale of a Product in the Territory.
Uptime means the time period when specified services are available with specified technical and service standards as mentioned in section titled WARRANTY SUPPORT” "%Uptime" means ratio of 'up time' (in minutes) as mentioned in section titled “Warranty support”
Commissioning Period has the meaning set forth in Attachment T.
Notice Delivery Period means the period from and including the Trade Date to and including the fifth Business Day following the date that is fourteen (14) calendar days after the Extension Date.
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.
Final delivery certificate means the document issued by the COE confirming that all the known defects have been rectified and that the works, goods or services appear in good order and have been accepted;
Launch means the intentional ignition of the first-stage motor(s) of the Launch Vehicle intended to place or try to place a Launch Vehicle (which may or may not include any Transfer Vehicle, Payload or crew) from Earth:
Developmental delay means that a child has not reached developmental milestones expected for his or her chronological age as measured by qualified professionals using appropriate diagnostic instruments and/or procedures.
House dust mite product means a product whose label, packaging, or accompanying literature states that the product is suitable for use against house dust mites, but does not indicate that the product is suitable for use against ants, cockroaches, or other household crawling arthropods.