APCEC definition

APCEC means the Arkansas Pollution Control and Ecology Commission.
APCEC means the Arkansas Pollution Control and Ecology Commission. “Department” means the Arkansas Department of Environmental Quality (ADEQ). “Director” means the Director of the Arkansas Department of Environmental Quality.
APCEC means the Arkansas Pollution Control and Ecology Commission or its successor, unless otherwise specified.

Examples of APCEC in a sentence

  • Continuation of expiring permits shall be governed by regulations promulgated in APCEC Regulation No. 6.

  • Except for data determined to be confidential under 40 CFR Part 2 and APCEC Regulation No. 6, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices of the Department of Environmental Quality.

  • The permittee shall comply with all applicable permit fee requirements (i.e., including annual permit fees following the initial permit fee that will be invoiced every year the permit is active) for wastewater discharge permits as described in APCEC Regulation No. 9 (Regulation for the Fee System for Environmental Permits).

  • Failure to promptly remit all required fees shall be grounds for the Director to initiate action to terminate this permit under the provisions of 40 CFR Parts 122.64 and 124.5(d), as adopted in APCEC Regulation No. 6 and the provisions of APCEC Regulation No. 8.

  • The limitations and requirements set forth in this permit for discharge into waters of the State are consistent with the Antidegradation Policy and all other applicable water quality standards found in APC&EC Regulation No. 2.

  • Current signatories who are also GCF members include Acre (Brazil), Amazonas (Brazil), California, Catalonia (Spain), Chiapas (Mexico), Cross River State (Nigeria), Jalisco (Mexico), Rondônia (Brazil), Tocantins (Brazil), and Ucayali (Peru).

  • The permittee shall comply with all applicable permit fee requirements for wastewater discharge permits as described in APCEC Regulation No. 9 (Regulation for the Fee System for Environmental Permits).

  • The general permit meet the requirements outlined in 40 CFR Part 122 and 40 CFR Part 412 for CAFOs seeking coverage under a general permit as well as requirements of APC&EC Regulation 6.

  • Failure of the permittee to comply with the provisions of APCEC Regulation No. 9 (Permit fees) as required by Part III.A.11 herein.

  • Additional requirements have been adapted from APC&EC Regulation 5.


More Definitions of APCEC

APCEC means the Arkansas Pollution Control and Ecology Commission.‌

Related to APCEC

  • CEC means the California Energy Commission or its successor agency.

  • APC means the Ambulatory Payment Classification system under 42 CFR 419.31 used by Medicare for grouping clinically and resource-similar procedures and services.

  • TP means fibre network termination point at the Installation Address.

  • SMC means a safety management certificate issued in respect of a Ship in accordance with rule 13 of the Code;

  • EPC means engineering, procurement and construction;

  • Customer Group means Customer and any of its Affiliates;

  • BSC means the Balancing and Settlement Code that is provided for in Standard Condition C3 (Balancing and Settlement Code (BSC)) of the Transmission Licence;