Approved Mine Plan definition

Approved Mine Plan means a mine plan which has been approved in accordance with the Applicable Laws in relation to the captive coal mine.

Examples of Approved Mine Plan in a sentence

  • With the tracking result of 10 individuals over 1 month, it shows that the concurrent video downloading (more than 5 people in one area) happens more than 30 times a week.

  • It was observed that the complete documents as were required to be submitted by the proponent namely; (i) Filled in Questionnaire for Environmental Appraisal of Mining Projects and (ii) Approved Mine Plan has neither been submitted to the Ministry nor circulated to the Members of EAC.

  • It is apposite to note that no coal mining can commence without the aforementioned approvals/consent and as such it becomes clear that any mining operation undertaken by the prior allottee was only after February 2014 and till 31.03.2015 i.e for a period 13 months only whereby the Approved Mine Plan become obsolete .

  • Unregistered Sales of Equity Securities and Use of Proceeds 41 Item 6.

Related to Approved Mine Plan

  • Approved Plan means plan for the building or lay out plan approved by the Authority in accordance with prescribed regulations.

  • Proven Mineral Reserve means the economically mineable part of a Measured Mineral Resource. A Proven Mineral Reserve implies a high degree of confidence in the Modifying Factors.

  • Measured Mineral Resource means that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

  • Approved Petroleum Engineer means any reputable firm of independent petroleum engineers as shall be selected by Borrower and approved by Administrative Agent, such approval not to be unreasonably withheld.

  • Probable Mineral Reserve means the economically mineable part of an indicated and, in some circumstances, a measured mineral resource demonstrated by at least a preliminary feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified;

  • Approved Annual Budget shall have the meaning set forth in Section 5.1.11(d) hereof.

  • the Approved Guidance means such guidance on the obtaining, recording and maintaining of information about costs and on the breaking down and allocation of costs by reference to Approved Reporting Currencies as may be published by Monitor; “Approved ReportingCurrencies” means such categories of cost and other relevant information as may be published by Monitor; “other relevant information” means such information, which may include quality and outcomes data, as may be required by Monitor for the purpose of its functions under Chapter 4 (Pricing) in Part 3 of the 2012 Act.

  • Approved Petroleum Engineers means (a) Netherland, Xxxxxx & Associates, Inc., (b) Xxxxx Xxxxx Company Petroleum Consultants, L.P. and (c) any other independent petroleum engineers reasonably acceptable to the Administrative Agent.

  • Contract Year means each period of twelve (12) consecutive months during the Initial Term of this Agreement, with the first Contract Year commencing on the Effective Date, and with each subsequent Contract Year commencing on the anniversary of the Effective Date.

  • Approved Budget means an annual budget-

  • Operating parameter value means a minimum or maximum value established for a control device or process parameter that, if achieved by itself or in combination with one (1) or more other operating parameter values, determines that an owner or operator has complied with an applicable emission limit.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Construction Plans means plans, drawings, specifications and related documents, and construction schedules for the construction of the Project, together with all supplements, amendments or corrections, submitted by the Developer and approved by the City in accordance with this Agreement.

  • Inferred Mineral Resource means that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

  • Operating Plan means a plan adopted or amended under this section for the development, redevelopment, maintenance, operation and promotion of a business improvement district, including all of the following:

  • Approved Plans means a stock option or similar plan for the benefit of employees or others which has been approved by the stockholders of the Acquiror.

  • flight plan means specified information provided to air traffic services units, relative to an intended flight or portion of a flight of an aircraft;

  • Redevelopment Plan means the “Lincoln Center Redevelopment Plan” passed, adopted and approved by the City pursuant to the Resolution, and shall include any amendment of said Redevelopment Plan heretofore or hereafter made by the City pursuant to law.

  • Eligible production company means that term as defined under section 455 of the Michigan business tax act, 2007 PA 36, MCL 208.1455.

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Model Year means the CI engine manufacturer’s annual production period, which includes January 1st of a calendar year, or if the manufacturer has no annual production period, the calendar year.

  • Gas Year means the period of 365 or 366 Gas Days, as the case may be, beginning at October 1st at 06:00 hours (Belgian time) and ending at September 30th 06:00 hours (Belgian time) of the next year.

  • PJM Region Peak Load Forecast means the peak load forecast used by the Office of the Interconnection in determining the PJM Region Reliability Requirement, and shall be determined on both a preliminary and final basis as set forth in Tariff, Attachment DD, section 5.

  • Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.