Baseline Delivery Schedule definition

Baseline Delivery Schedule means, in respect of a Phase, the baseline delivery schedule including the minimum requirements set out in Clause 13.1, and which has been approved by the SoS, or any amended version which is substituted for it in accordance with Clause 13.8;
Baseline Delivery Schedule means the base line delivery schedule as set forth in Exhibit B.

Examples of Baseline Delivery Schedule in a sentence

  • Owner and Contractor shall negotiate in good faith in an effort to reach mutually agreeable terms under which Contractor would continue to perform under this Contract, including any requested equitable adjustment to the Target Cost, Baseline Delivery Schedule or other changes to the terms of this Contract.

  • Owner may revise the quantity of Centrifuge Machines to be delivered, the Specifications and requirements contained in the SOW and/or the Baseline Delivery Schedule or other terms contained in the SOW by written modification issued in accordance with Article 22.

  • Contractor shall procure, manufacture and assemble, and deliver centrifuge components, Centrifuge Machine subassemblies, and completed Centrifuge Machines in accordance with drawings, specifications and other design and assembly requirements as listed in Appendix A hereto and the Baseline Delivery Schedule set out in Exhibit B tot eh ESA.

  • Liquidated Damages with respect to any Centrifuge Machines required by the Baseline Delivery Schedule to be available for Owner installation on or before ***** and not so available on ***** shall begin to be assessed Liquidated Damages as if they were due to be delivered on *****.

  • Provisions for Liquidated Damages are based on Contractor providing Centrifuge Machines at the ACP Facility in accordance with the Baseline Delivery Schedule attached hereto as Exhibit B.

  • Accordingly, Contractor shall not be liable for Liquidated Damages prior to ***** provided that the requisite total cumulative number of Centrifuge Machines as required by the Baseline Delivery Schedule as of such date is available for Owner installation on or before *****.

Related to Baseline Delivery Schedule

  • Delivery Schedule means the schedule for the delivery of Services as set forth in attached Annex 3.

  • Baseline Schedule means the initial time schedule prepared by Contractor for Owner’s information and acceptance that conveys Contractor’s and Subcontractors’ activities (including coordination and review activities required in the Contract Documents to be performed by A/E and ODR), durations, and sequence of work related to the entire Project to the extent required by the Contract Documents. The schedule clearly demonstrates the critical path of activities, durations and necessary predecessor conditions that drive the end date of the schedule. The Baseline Schedule shall not exceed the time limit current under the Contract Documents.

  • Share Delivery Quantity For any Settlement Date, a number of Shares, as calculated by the Calculation Agent, equal to the Net Share Settlement Amount for such Settlement Date divided by the Settlement Price on the Valuation Date for such Settlement Date.

  • Service delivery area means the defined geographic area for delivery of program services.

  • Product Schedule means the “Product Schedule” that forms part of the Contract.

  • Calling Name Delivery Service (CNDS) means a service that enables a terminating End User to identify the calling Party by a displayed name before a call is answered. The calling Party’s name is retrieved from a calling name database and delivered to the End User’s premise between the first and second ring for display on compatible End User premises equipment.

  • Contract Schedule The list (as such list may be amended from time to time) identifying each Contract constituting part of the corpus of the Trust Fund as of the Cut-off Date, and which (a) identifies each Contract as either a Fixed Rate Contract or Adjustable Rate Contract and by contract number and name and address of the Obligor and (b) sets forth as to each Contract (i) the unpaid principal balance as of the related Transfer Date determined by giving effect to payments received prior to the related Transfer Date, (ii) the amount of each scheduled payment due from the Obligor, and (iii) the APR.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Project Deliverables means the Project deliverables set out in Schedule 2. Project Material means all the material including but not limited to documents, computer software, and data stored by any means which is created by the Fellow in the course of undertaking the Project.

  • Base Capacity Resource Price Decrement means, for the 2018/2019 and 2019/2020 Delivery Years, a difference between the clearing price for Base Capacity Resources and the clearing price for Capacity Performance Resources, representing the cost to procure additional Capacity Performance Resources out of merit order when the Base Capacity Resource Constraint is binding.

  • Milestone Schedule means Seller’s milestone schedule, the form of which is attached to this Agreement as Exhibit Q.

  • Time Schedule means the Time Schedule for final completion of the Works or Mechanical Completion of the Plant(s)/Unit(s), as the case may be, incorporated in the Contract or as may be extended by the OWNER or Engineer- in-Charge pursuant to the provisions hereof and shall include interim time schedules set up for achieving interim/phase-wise/stage-wise progress/completion/testing/commissioning/ handing over, as may be prescribed by the OWNER/Engineer-in-Charge, within the overall Time Schedule as originally envisaged or as extended.

  • Price Schedule means the schedules or any part or individual schedule thereof, submitted by the Bidder with his Bid and forming a part of the Contract;

  • Expedited Deliverability Study means a deliverability study that an eligible Developer may elect to pursue as that term is defined in OATT Section 25 (OATT Attachment S) that may determine the extent to which an existing or proposed facility satisfies the NYISO Deliverability Interconnection Standard at its requested CRIS level without the need for System Deliverability Upgrades. The schedule and scope of the study is defined in Sections 25.5.9.2.1 and 25.7.1.2 of this Attachment S.

  • Notice Delivery Period means the period from and including the Trade Date to and including the fifth Business Day following the date that is fourteen (14) calendar days after the Extension Date.

  • Specification Schedule means the Schedule containing details of the Specification.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Price Level means the price of the Share last determined and published by the Exchange on any day (official closing price).

  • Service Specific Terms has the meaning given in the G Suite Agreement or Complementary Product Agreement, as applicable, or, if Customer’s G Suite Agreement does not define “Service Specific Terms”, means the then-current terms specific to one or more Core Services for G Suite set out at xxxxx://xxxxxx.xxxxxx.xxx/terms/service-terms/.

  • Equipment Schedule means (a) each Equipment Schedule attached to the applicable Requisition and (b) each Equipment Schedule attached to the applicable Lease Supplement.

  • Service Specification means and include detailed description, statements to technical data, performance characteristics, and standards (Indian as well as) as applicable and as specified in the Contract as well as those specifications relating to Industry standards and codes applicable to the performance of the work, work performance quality and the specifications affecting the works or any additional specification required to be produced by the DCO to meet the design criteria.

  • Completion Schedule means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract;

  • Shift Schedule means a written statement setting forth the days and hours upon which the employees are required to work.

  • Delivery Point means the point(s) of connection(s) at which energy is delivered into the Grid System i.e. the Interconnection Point.

  • service delivery agreement means an agreement between the Municipality and an institution or persons mentioned in section 76(b) of the Local Government: Municipal Systems Act 32 of 2000.