Examples of Blasting Permit in a sentence
A Blasting Permit shall be issued only after a Pre-Blast Structural Condition Survey and Blasting Plan has been performed.
The variable examined in this project is low density land cover and low density residential land use.Shannon's entropy can be applied to urban sprawl calculations by measuring the number of pixels classified as low-density developed land in comparison with number of pixels classified as undeveloped land.
In accordance with Johnson County Code of Regulations for Buildings and Construction, Article 15, Section 3, before blasting is started for each permit, the blaster shall inform all residents and people working (including utilities) within 1,500 feet of the blasting location/area, which is identified on a map that is included in the Blasting Permit.
The City Blasting Permit only covers the blasting process and does not replace the need to obtain a site grading permit.
If permitted a Blasting Permit obtained through the Grandview Fire Department is required.
Two private submitters were concerned about further GM approvals being made until the findings of the Review of Food Labelling Law and Policy are released, and the findings of research conducted by Dr Judy Carman become publicly available.
In Eq. (41g), the constraints on the total (physical) motion are imposed at velocity level.
Fill out an "Application for Blasting Permit" from the Office of the City Engineer, Room 450, City Hall.
If the City grants permission for blasting, conduct the operations in strict accordance with the regulations attached to the "Application for Blasting Permit" and additional regulations specified herein.
Procedure: Blasting for excavation will be permitted only after securing the approval of the City of Tega Cay Utility Department, and a South Carolina State Blasting Permit has been obtained and a copy given to the TCUD Inspector, and only when proper precautions are taken for the protection of persons and property.