Bridgeport Project definition

Bridgeport Project means the approximately 490 megawatt (nominal) natural gas-fired combined cycle electric generating plant located on a site in the City of Bridgeport, Fairfield County, Connecticut, together with all auxiliary equipment, ancillary and associated facilities and equipment, electrical transformers, pipeline and electrical interconnection and metering facilities (whether owned or leased by Bridgeport Energy or NC Development) used for the receipt of fuel and water and the delivery of the electrical and potential steam output of said generating plant, and all other improvements related to the ownership, operation and maintenance of said generating plant and associated equipment.
Bridgeport Project means the 14.9 MW Bridgeport Fuel Cell project located in Bridgeport, Connecticut.

Examples of Bridgeport Project in a sentence

  • Pursuant to the terms and conditions set forth below, CRRA is willing to accept “Acceptable Solid Waste,” as defined in CRRA’s Bridgeport Project Permitting, Disposal and Billing Procedures (“Procedures”), attached hereto as Exhibit A and made a part hereof, generated within the corporate boundaries of CRRA Project Municipalities (as hereinafter defined) and delivered by Hauler to CRRA’s Bridgeport resources recovery facility located at 0 Xxxxxx Xxxxxx, Bridgeport, Connecticut (the “Designated Facility”).

  • CRRA purchased the landfill in November 1983 in connection with the development of the CRRA Bridgeport Project.

  • The Resilient Bridgeport Project Team is requesting to update the Board of Park Commissioners on the State (DOT, DOH, DEEP) continuing work to advance its flood control project in the South End.

  • He said the other two audits concern the closure of the Bridgeport Project and is reflected in the cash requirements for Bridgeport.

  • Delivery to Lead Arranger of a schedule of the scheduled Completion Dates for each Identified Project (other than the Bridgeport Project and the New Haven Project), in substantially the form of Exhibit G-3 hereto, which schedule shall be reasonably satisfactory to the Arrangers.

  • A resolution setting date for public hearing on condemnation of a structure located at 1103 14th Street, Jessie McCleland, Jr. and Dorothy McCleland, owners.A resolution setting date for public hearing on condemnation of a structure located at 610 South Franklin Street, Ida Reeder, Leola Johnson, Leola Lafedge Jones, Cathy Lafedge, Clarence Lafedge, Elva Lafedge, Gilda Lafedge, Wilbert Lafedge, and Willie H.

  • However, Bridgeport Energy submitted an application to amend its environmental approval in October 2021 (Bridgeport Project) (prior to the finalisation of the Surat Project EIS) which indicates that some of the CO2 captured by the PCC plant will be supplied to Bridgeport to be used for EOR:The initial EOR project plan is to inject up to 120,000 tonnes p.a. of liquid phase CO2 into the depleted Moonie Oil Field (PL1), for a period of eight years.

  • The Wallingford Project bonds mature on November 15, 2008; the Bridgeport Project bonds mature on January 1, 2009; the Mid-Connecticut Project bonds mature on November 15, 2012; and the Southeast Project bonds mature on November 15, 2015.

  • Mr. Bolduc said that as CRRA transitions out of the Bridgeport Project (a situation that the Wallingford Project will also be in) structural changes have been made to recognize that although there is no requirement per a town contract; budgets should still come to the Finance Committee and Board for approval.

  • Pursuant to the terms and conditions set forth below, CRRA is willing to accept “Acceptable Waste,” as defined in CRRA’s Bridgeport Project Permitting, Disposal and Billing Procedures (“Procedures”), attached hereto as Exhibit A and made a part hereof, generated within the corporate boundaries of CRRA Project Municipalities (as hereinafter defined) and delivered by Hauler to CRRA’s Bridgeport resources recovery facility located at 0 Xxxxxx Xxxxxx, Bridgeport, Connecticut (the “Designated Facility”).

Related to Bridgeport Project

  • Michigan state housing development authority means the Michigan state housing development authority created under section 21 of the state housing development authority act of 1966, 1966 PA 346, MCL 125.1421.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Redevelopment entity means a municipality or an entity

  • Urban renewal project means undertakings and activities of a municipality in an urban renewal area for the elimination and for the prevention of the development or spread of slums and blight, and may involve slum clearance and redevelopment in an urban renewal area, or rehabilitation or conservation in an urban renewal area, or any combination or part of them in accordance with an urban renewal plan. These undertakings and activities may include:

  • Environmental Management Framework and “EMF” mean the framework of the Borrower for the management of social and environmental aspects of the Project dated April 24, 2007 and disclosed to the public on even date therewith, as may be amended from time to time with the prior approval of the Bank.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Mature marijuana plant means a marijuana plant that is not an immature marijuana plant.

  • Redevelopment project means a specific construction project

  • Real estate-related financial transaction means any transaction involving:

  • Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.

  • Capitol hill complex means the grounds and buildings within the area bounded by 300 North Street, Columbus Street, 500 North Street, and East Capitol Boulevard in Salt Lake City.

  • Infrastructure project means any activity related to the construction, alteration, maintenance, or repair of infrastructure in the United States regardless of whether infrastructure is the primary purpose of the project. See also paragraphs (c) and (d) of 2 CFR 184.4.

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • TLR means the NERC Transmission Loading Relief Procedures used in the Eastern Interconnection as specified in NERC Operating Policies.

  • Renewable energy project means (A) a project

  • Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of [NH-** from km ** to km **] and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Infrastructure facility means a building; structure; or networks of buildings, structures, pipes, controls, and equipment, or portion thereof, that provide transportation, utilities, public education, or public safety services. Included are government office buildings; public schools; courthouses; jails; prisons; water treatment plants, distribution systems, and pumping stations; wastewater treatment plants, collection systems, and pumping stations; solid waste disposal plants, incinerators, landfills, and related facilities; public roads and streets; highways; public parking facilities; public transportation systems, terminals, and rolling stock; rail, air, and water port structures, terminals, and equipment.

  • Natural area means an area of the rural or non-urban environment which is in an unspoilt natural state or is of high scenic value, and includes, but is not limited to, national parks, game reserves, nature reserves, marine reserves, wilderness areas, areas of extensive agriculture and scenic areas.

  • Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.

  • Commercial project means any project, including, but not

  • Tourism destination project means a qualified non-gaming business facility that will be among the most visited privately owned or operated tourism or recreation sites in the State, and which is located within the qualified incentive area and has been determined by the authority to be in an area appropriate for development and in need of economic development incentive assistance, including a non-gaming business within an established Tourism District with a significant impact on the economic viability of that District.

  • Coal preparation plant means a facility where coal is crushed, screened, sized, cleaned, dried, or otherwise prepared and loaded for transit to a consuming facility. “Coal preparation plant associated areas” means the coal preparation plant yards, immediate access roads, coal refuse piles, and coal storage piles and facilities. “Coal preparation plant water circuit means all pipes, channels, basins, tanks, and all other structures and equipment that convey, contain, treat, or process any water that is used in coal preparation processes within a coal preparation plant.

  • Renewable energy facility means an electric generation unit or other facility or installation that produces electric energy using a Renewable Energy Source.