Examples of Bulk Supply Points in a sentence
The CAISO shall publish a list of the Bulk Supply Points or interconnection points to which this Section 26.1.4.4 applies together with details of the electronic form and procedure to be used by Scheduling Coordinators to submit the required information on the CAISO Website.
The ISO shall publish a list of the Bulk Supply Points or interconnection points to which this Section 26.1.4.4 applies together with details of the electronic form and procedure to be used by Scheduling Coordinators to submit the required information on the ISO “Home Page”.
The ISO shall publish a list of the Bulk Supply Points or interconnection points to which this Section7.1.4.4 applies together with details of the electronic form and procedure to be used by Scheduling Coordinators to submit the required information on the ISO “Home Page”.FERC ELECTRIC TARIFFFIRST REPLACEMENT VOLUME NO.
DOPSD0108 – This was calculated by the summation of all transmission substation (Endeavour Energy Bulk Supply Points) weather corrected values at the 10% PoE MW level.
DOPSD0207 – This was calculated by taking the summation of all individual transmission substations (EE Bulk Supply Points) maximum demand for the relevant financial year in MVA.
DOPSD0109 – This was calculated by the summation of all transmission substation (Endeavour Energy Bulk Supply Points) temperature corrected values at the 50% PoE MW level.
DOPSD0210 – This was calculated by the summation of all transmission substations (EE Bulk Supply Points) in MW by date and time and then finding the maximum of the summated values in MW and converted to MVA by its respective power factor.
DOPSD0211 – Summation of all transmission substations (EE Bulk Supply Points) by date and time and applying a weather correction to the summated values at the 10% PoE MW Level.
DOPSD0212 – Summation of all transmission substations (EE Bulk Supply Points) by date and time and applying a weather correction to the summated values at the 50% PoE MW Level.
DOPSD0112 – Summation of all transmission substations (Endeavour Energy Bulk Supply Points) by date and time and applying a weather correction to the summated values at the 50% PoE MW Level.