Commissioning Requirements definition

Commissioning Requirements means the requirements contained in paragraph 7 of Schedule 3 of the Agreement;
Commissioning Requirements means the latest version of TVA’s Commissioning Checklist and Guidelines. An Energy Resource at or above 25 MVA will be subject to the full Commissioning Requirements and, in TVA’s sole discretion, an Energy Resource with Deployment below 25 MVA may require full or partial compliance with the Commissioning Requirements.
Commissioning Requirements means NES’s Distributed Generation Checklist which can be found in Appendix A. All Energy Resources will be subject to the full Commissioning Requirements.

Examples of Commissioning Requirements in a sentence

  • These requirements are detailed in Code of Practice Four - "Code of Practice for Calibration, Testing and Commissioning Requirements for Metering Equipment for Settlement Purposes".

  • In the present contribution a step towards this goal is taken by applying a baseline closure model that was previously shown to work reasonably well for bubbly flows in pipes and bubble columns of different size and shape 39-43 to an airlift column with internal draft tube.

  • When Section 01 91 00 General Commissioning Requirements is included in the contract, the submittals required by the section have to be coordinated with the Section 01 33 23 Shop Drawings, Product Data, and Samples to ensure adequate time is allowed for each type of submittal required.

  • These requirements are detailed in Metering Code of Practice S4 - "Metering Code of Practice for Calibration, Testing and Commissioning Requirements for Metering Equipment for Allocation Purposes".

  • This Section supplements the general requirements specified in Section 01 91 00 General Commissioning Requirements.

  • These requirements are detailed in Code of Practice Four – “Code of Practice for Calibration, Testing and Commissioning Requirements for Metering Equipment for Settlement Purposes”.

  • Make, or commit to make, any capital expenditures that exceed by more than five percent (5%) Limestone’s capital expenditure budget set forth in Section 4.01(p) of the Limestone Disclosure Schedule.

  • These requirements are detailed in Code of Practice Four1 - "Code of Practice for Calibration, Testing and Commissioning Requirements for Metering Equipment for Settlement Purposes".

  • The Principle of the method is shown on schedule No.6 and the procedure laid down under Testing and Commissioning Requirements.

  • Inductive voltage transformersBalancing and Settlement CodeDefinitions, Section X; Annex X-1 and Section L and BSC ProceduresCode of Practice FourCode of Practice for Calibration, Testing and Commissioning Requirements for Metering Equipment for Settlement PurposesBSC ProceduresBSCP06, BSCP32, BSCP601Electricity Act 1989Schedule 7 as amended by Schedule 1 to the Competition and Services (Utilities) Act 1992.


More Definitions of Commissioning Requirements

Commissioning Requirements. Means the commissioning requirements communicated by WPD to the Connection Provider as annexed to the relevant Site Specific Agreement.
Commissioning Requirements means the commissioning requirements communicated by Electricity North West to the ICP as included in the relevant Schedule of Work.
Commissioning Requirements means the requirements for the commissioning contained in Part Companies Act means the Companies Act 2006;

Related to Commissioning Requirements

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Pretreatment requirements means any substantive or procedural requirement related to pretreatment, other than a pretreatment standard, imposed on an industrial user.

  • Risk Retention Requirements means the credit risk retention requirements of Section 15G of the Exchange Act (15 U.S.C. §78o-11), as added by Section 941 of the Xxxx-Xxxxx Xxxx Street Reform and Consumer Protection Act.

  • Periodic Billing Requirement means, for any Remittance Period, the aggregate amount of Charges calculated by the Servicer as necessary to be billed during such period in order to collect the Periodic Payment Requirement on a timely basis.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.