Curb idle test definition

Curb idle test means an exhaust emissions test conducted with the engine of the vehicle running at the manufacturer’s idle speed ± 100 RPM but without pressure exerted on the accelerator.
Curb idle test means an exhaust emissions test conducted with the engine of a vehicle running at the manufacturer's specified idle speed plus or minus one hundred revolutions per minute but without pressure exerted on the accelerator.
Curb idle test means an exhaust emissions test sampling and analysis performed while the vehicle engine is operating at or approximately at the vehicle manufacturer’s recommended normal curb idle speed.

More Definitions of Curb idle test

Curb idle test means an exhaust emissions test sampling and analysis performed while the vehicle engine is operating at or approximately at the vehicle manufacturer’s recommended normal curb idle speed.["Department" means the Department of Natural Resources and Environmental Control of the State of Delaware.]
Curb idle test means an exhaust emissions test conducted with the engine of the vehicle running at the manu- facturer’s idle speed ± plus or minus 100 RPM but without pressure exerted on the accelerator.
Curb idle test as used in this section shall mean the test used to analyze exhaust gas concentrations
Curb idle test means an exhaust emissions test sampling and analysis performed while the vehicle engine is operating at or approximately at the vehicle manufacturer's recommended normal curb idle speed. "Director" means the Director of the Division of Motor Vehicles in the Department of Transportation.
Curb idle test means an exhaust emissions test sampling and analysis performed while the vehicle engine is operating at or approximately at the vehicle manufacturer’s recommended normal curb idle speed. “Department” means the Department of Natural Resources and Environmental Control of the State of Delaware. "Director" means the Director of the Division of Motor Vehicles in the Department of Transportation.

Related to Curb idle test

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Cannabis testing facility means an entity registered by

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Asset Test means, for an Asset Review, each Test, as defined in the Asset Representations Review Agreement, in Schedule A to the Asset Representations Review Agreement to be performed by the Asset Representations Reviewer on the related Asset Review Receivables.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Screening Test Technician (STT) means anyone who instructs and assists individuals in the alcohol testing process and operates an ASD.

  • Stand-Alone Test Environment or "SATE" shall have the meaning set forth in Section 12.2.9.3.2.

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Incurrence Test means the incurrence test set out in Clause 12.1 (Incurrence Test).

  • Subsurface Borings and Testing means borings, probings and subsurface explorations, laboratory tests and inspections of samples, materials and equipment; appropriate professional interpretations of all the foregoing.

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.