Date of Decommissioning definition

Date of Decommissioning means the effective
Date of Decommissioning means the effective date of the surrender of the FERC License for the Morris Sheppard Dam Project No. 1490-052 under the Order Accepting the Surrender of the License (issued December 23, 2011), 137 FERC 62,252.
Date of Decommissioning means the effective date of the surrender of the FERC License for the Morris Sheppard

Examples of Date of Decommissioning in a sentence

  • The Code Enforcement Officer shall notify the solar facility operator or landowner by certified mail with signed receipt specifying, at a minimum, the Date of Decommissioning and that the LSSES must be removed, and the site be restored to its condition prior to development within 360 days.

  • Authorizes the Authority, for a period of two years after the Date of Decommissioning, to sell the Remaining Leased Tract in whole or in part, to a Purchaser in accordance with applicable law, this subsection, and Subsections (d), (e), (f), (g), (h), and (i).

  • Movements in the allowance for diminution in value of inventories account during the six-month period ended 30 June 2009 are summarised below.

  • The Code Enforcement Officer shall notify the landowner by certified mail with signed receipt specifying, at a minimum, the Date of Decommissioning and that the Wind Energy Facility must be removed, and the site be restored to its condition prior to development within 120 days.

  • For a period of two years after the Date of Decommissioning, the Authority may sell the Remaining Leased Tract in whole or in part, to a Purchaser in accordance with applicable law, this subsection, and Subsections (d), (e), (f), (g), (h), and (i).

  • This subsection shall only apply to, and be effective for, those portions of the Remaining Leased Tract (if any) for which Closing has not occurred on or before the second anniversary of the Date of Decommissioning, pursuant to Subsection (b), in which case the effective date of this subsection shall be the second anniversary of the Date of Decommissioning.


More Definitions of Date of Decommissioning

Date of Decommissioning means in respect of each part of the authorised development, the date that that part of the authorised development has permanently ceased to generate electricity on a commercial basis;

Related to Date of Decommissioning

  • Decommissioning means final operational activities at a site to dismantle site structures, to decontaminate site surfaces and remaining structures, to stabilize and contain residual radioactive material, and to carry out any other activities to prepare the site for postoperational care.

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Project Start Date means the first Milestone Start Date specified in Schedule B;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Phase 2 means the phase of the ATP comprised of: (1) improvements to the State Street Substation to receive Rebuilt Line 972; (2) the rebuilding of NYSEG’s existing Line 972 not performed in Phase 1; (3) construction of Relocated Line 15; (4) the construction of Bused Line 5; (5) improvements to the Elbridge Substation to receive Relocated Line 15; and (6) improvements to the Elbridge Substation to receive Bused Line 5.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Phase II means the second part of the tuition incentive assistance program which provides assistance in the third and fourth year of 4-year degree programs.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Construction Completion Date means date of the completion of the Construction Period, which shall be at the expiry of a period of 24 (Twenty Four) months from the Compliance Date or such other date (with the consent of the Authority) by which the overall development of the Project is completed in accordance with the provisions of this Concession Agreement and when the Construction Completion Certificate is issued by Authority as per Article 14.1.

  • Project Commencement Date means the commencement date notified to the Minister pursuant to clause 4(1);

  • Phase I means the first part of the tuition incentive assistance program defined as the academic period of 80 semester or 120 term credits, or less, leading to an associate degree or certificate.

  • Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.

  • Stormwater system means both the constructed and natural facilities, including pipes, culverts, watercourses and their associated floodplains, whether over or under public or privately owned land, used or required for the management, collection, conveyance, temporary storage, control, monitoring, treatment, use and disposal of stormwater;

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Assessment area means an area, or, if more than one area is designated, the

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Phase or “Phases” in respect of the Project shall mean that the components of the Project are placed in service during more than one year during the Investment Period, and the word “Phase” shall therefore refer to the applicable portion of the Project placed in service in a given year during the Investment Period.

  • Start means the day falling the Relevant Number of Index Days prior to the first day of the relevant Interest Period.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.