DC Test definition

DC Test means a capacity test of a PDR in the DRAM Resource for one hundred percent (100%) of such PDR’s Qualifying Capacity for the applicable Showing Month (where such Qualifying Capacity has been submitted in Seller’s Supply Plan for that Showing Month), with a duration of at least two (2) consecutive Availability Assessment Hours, conducted by the Seller’s SC during the applicable Showing Month, in accordance with the CAISO Tariff and D.14-06- 050, Appendix B, that is used to demonstrate capacity.
DC Test means a capacity test of a PDR in the DRAM Resource for one hundred percent (100%) of such PDR’s Qualifying Capacity for the applicable Showing Month (where such Qualifying Capacity has been submitted in Seller’s Supply Plan for that Showing Month), with a duration of at least two (2) consecutive Availability Assessment Hours, conducted by the Seller’s SC during the applicable Showing Month, in accordance with the CAISO Tariff and D.00-00-000, Appendix B, that is used to demonstrate capacity.
DC Test means the capacity test(s) of a PDR in the DRAM Resource for one hundred percent (100%) of such PDR’s Qualifying Capacity for the applicable Showing Month (where such Qualifying Capacity has been submitted in Seller’s Supply Plan for that Showing Month) for a duration of at least (i) one (1) Clock Hour within the Availability Assessment Hours for all Showing Months except the Showing Month of August or (ii) for a duration of at least two (2) consecutive Clock Hours within the Availability Assessment Hours for the Showing Month of August, conducted by the Seller’s SC during the applicable Showing Month, in accordance with the CAISO Tariff and D.00-00-000, Appendix B, that is used to demonstrate capacity.

Examples of DC Test in a sentence

  • The Demonstrated Capacity for System and Local Capacity will equal the maximum hourly load reduction during any hour of such DC Test as calculated using the Capacity Baseline; provided that, for the Showing Month of August the Demonstrated Capacity for System and Local Capacity will equal the average hourly load reduction during any two (2) consecutive hours as calculated using the Capacity Baseline.

  • The Demonstrated Capacity for Flexible Capacity will equal the average hourly load reduction during any hour of such DC Test as calculated using the Capacity Baseline; provided that, for the Showing Month of August the Demonstrated Capacity for Flexible Capacity will equal the average hourly load reduction during any two (2) consecutive hours as calculated using the Capacity Baseline.

  • For example, if the Delivery Period consists of seven (7) Showing Months, then a DC Test or DC Dispatch shall be required for at least three (3) of such Showing Months, including the Showing Month of August.

  • In all cases, if the Parties do not agree upon the reduction in Seller’s Supply Plan quantities under subsection 3.1(b)(i) above, then a DC Dispatch or DC Test shall be required for each and every Showing Month for which Buyer has issued a QC De-Rate Notice.

  • The results of a DC Test in the event that (A) there is no DC Dispatch of the PDR in the DRAM Resource for one hundred percent (100%) of the Qualifying Capacity of the applicable Showing Month, and (B) Seller does not submit the results of a Partial DC Dispatch during the Showing Month as contemplated under 1.6(a)(i) above.

  • The Showing Months in which DC Dispatches or DC Tests are conducted may be different for each such PDR except for the Showing Month of August, in which a DC Dispatch or DC Test is required for every PDR in the DRAM Resource pursuant to Section 1.6(b)(i).

  • If Buyer issues a QC De-Rate Notice, then Seller shall provide Notice to Buyer, no later than five (5) Business Days after receipt of such QC De-Rate Notice, that Seller will either: reduce the quantities in its Supply Plan for the applicable Showing Month to conform to the quantities shown in the QC De-Rate Notice (or such other amount as may be agreed in writing by Xxxxx and Seller); or perform a DC Dispatch or DC Test during the applicable Showing Month.

  • The ERCOT generator data used to construct the 8-Bus ERCOT DC Test Grid were obtained from the U.S. Energy Information Administration (EIA) [36].

  • This section reports DAM/RTM LMP and scheduled dispatch outcomes for the 8-Bus ERCOT DC Test Case determined for five successive test-case days D1 through D5.20Recall from Sections 7.3 and 7.4 that net load for the test case is im- plemented as load minus NDG using actual ERCOT load and NDG data in day-ahead forecasted and realized forms.

  • Input voltageV Output currentmA DC Auxiliary voltageV D.C. Test voltage (input to earth)kV Power consumptionVA Module dimensioncm x cm 5.Frequency transducer Manufacturer Type Accuracy (at ambient temp.


More Definitions of DC Test

DC Test means the capacity test(s) of a PDR in the DRAM Resource for one hundred percent (100%) of such PDR’s Qualifying Capacity for the applicable Showing Month (where such Qualifying Capacity has been submitted in Seller’s Supply Plan for that Showing Month) for a duration of at least (i) one (1) Clock Hour within the Availability Assessment Hours for all Showing Months except the Showing Month of August or (ii) for a duration of at least two (2) consecutive Clock Hours within the Availability Assessment Hours for the Showing Month of August, conducted by the Seller’s SC during the applicable Showing Month, in accordance with the CAISO Tariff and D.14-06-050, Appendix B, that is used to demonstrate capacity.

Related to DC Test

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Genetic test means an analysis of human DNA, RNA, chromosomes, proteins, or metabolites, that detect genotypes, mutations, or chromosomal changes. The term “genetic test” does not mean an analysis of proteins or metabolites that does not detect genotypes, mutations, or chromosomal changes; or an analysis of proteins or metabolites that is directly related to a manifested disease, disorder, or pathological condition that could reasonably be detected by a health care professional with appropriate training and expertise in the field of medicine involved.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Asset Test means, for an Asset Review, each Test, as defined in the Asset Representations Review Agreement, in Schedule A to the Asset Representations Review Agreement to be performed by the Asset Representations Reviewer on the related Asset Review Receivables.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Cannabis testing facility means an entity registered by

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Collateral Quality Test means a test that is satisfied if, as of any date of determination, in the aggregate, the Collateral Loans owned (or in relation to a proposed acquisition of a Collateral Loan, both owned and proposed to be owned) by the Borrower satisfy each of the tests set forth below, calculated in each case in accordance with Section 1.3:

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Incurrence Test means the incurrence test set out in Clause 12.1 (Incurrence Test).

  • Critical Test Concentration or "(CTC)" means the specified effluent dilution at which the Permittee is to conduct a single-concentration Aquatic Toxicity Test.