Design activity definition

Design activity means an organization, Government, or contractor that has responsibility for the design and configuration of an item, including the preparation or maintenance of design documents. Design activity could be the original organization, or an organization to which design responsibility has been transferred.
Design activity means the activities of AMD Saxonia to provide the Services, including without limitation to research, design and develop custom circuits, schematics and layouts and such other activities as shall from time to time be requested of it pursuant to the AMD Saxonia Research Agreement;
Design activity means the activities of AMD Fab 36 KG to provide the Services, including without limitation to research, design and develop custom circuits, schematics and layouts and such other activities as shall from time to time be requested of it by the AMD Inc. or AMD Fab 36 Holding.

Examples of Design activity in a sentence

  • Design activity means an organization, Government or contractor, that has responsibility for the design and configuration of an item, including the preparation or maintenance of design documents.

  • Design activity could be the original organization, or an organization to which design responsibility has been transferred.

  • Service Design activity offers a significant commercial opportunity for the College and underpins much of the work being undertaken within our Good to Great strategy.

  • Design activity standards, drawings, specifications, or other documents referenced on drawings or lists.

  • Design activity — current: the design activity currently responsible for the design of an item.

  • Students will gain exposure to new applications and characteristics of a familiar material such as paper, and will also learn to work in a group, accomplishing a single goal, and also competing with others as groups.For more information on Structure is Key, see Appendix E which contains activity package documents.Train DesignThe Train Design activity has students build a train car from crafting materials that they then test on a railway (Figure 12).

  • Design activity cannot be separated into a single stage of the system development lifecycle, as in the traditional model: requirements specification, design, and technical system implementation are intertwined (Bansler and Bødker 1993) and so require support and legitimacy at all stages of the system development life-cycle.

  • It requires that students learn by trial and error.Figure 12: One example of a train car for the Train Design activity utilizing lollipop sticks, tape, wire, spools, and dowels The activity places students in groups of 2-3 to design, build, and test a train car that will run down a predetermined rail track when attached to their classmates train cars via hooks.

  • Design activity, during the second phase, inventing, developing and analyzing possible courses of action take place.

  • Design activity and reservoirs, adapted from (Boyle and Duffy, 2009)With a view to improving the company-territory’s' global performance, we propose that, where possible, active and passive resources derived from reservoirs external to the territory are replaced by resources from within the territorial reservoir.

Related to Design activity

  • Construction activity means any clearing, grading or excavation associated with large construction activity or associated with small construction activity.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.

  • Development Activity means any activity defined as Development which will necessitate a Floodplain Development Permit. This includes buildings, structures, and non-structural items, including (but not limited to) fill, bulkheads, piers, pools, docks, landings, ramps, and erosion control/stabilization measures.

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • New Work means any Services/Deliverables outside the scope of the Contract and not specifically provided under any Statement of Work, that once added will result in the need to provide the Contractor with additional consideration.

  • Digital audio-visual work means a series of related images which, when shown in succession, imparts an impression of motion, together with accompanying sounds, if any.

  • Design-bid-build means a project delivery method in which:

  • Design torso angle means the angle measures between a vertical line through the "R" point and the torso line in a position which corresponds to the design position of the seat-back established by the vehicle manufacturer;

  • Development Work means any work carried out in relation to the physical construction of a mine;

  • Sign area means the total surface area within the outer periphery of the said sign, and in the case of a sign comprised of individual letters or symbols, shall be calculated as the area of a rectangle enclosing the letters or symbols. Frames and structural members not bearing advertising matter shall not be included in computation of surface area.

  • Project Work means the work required to complete the Project.

  • Design-build team means an entity that consists of:

  • Design-build means a project delivery method in which the detailed design and subsequent construction is provided through a single contract with a Design-Build firm; a team, partnership, or legal entity that includes design professionals and a builder. The Design-Build Project delivery shall be implemented in accordance with Tex. Gov’t Code § 2166.2531.2

  • Design Change is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • licensed activity means any activity or activities listed in section 21 of the 2010 Act which is, or are authorised under the licence;

  • Cost of work , in table above, shall mean the agreement amount of the work.

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • job work means any treatment or process undertaken by a person on goods belonging to another registered person and the expression “job worker” shall be construed accordingly;

  • Design means the appearance of the whole or a part of a product resulting from the features of, in particular, the lines, contours, colours, shape, texture and/or materials of the product itself and/or its ornamentation;

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Design-Build Firm means a partnership, corporation or other legal entity that:

  • design contests means those procedures which enable the contracting authority to acquire, mainly in the fields of town and country planning, architecture and engineering or data processing, a plan or design selected by a jury after being put out to competition with or without the award of prizes.

  • Project Scope means the description or activity of work to be accomplished on the project.

  • Design Criteria means the design criteria set out in the Ministry’s publication “Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under Environmental Compliance Approval”, (as amended from time to time).

  • Installation means that the System or a Subsystem as specified in the Contract is ready for Commissioning as provided in GCC Clause 26 (Installation).