danger area means an airspace of defined dimensions within which activities dangerous to the flight of aircraft may exist at specified times;
Service-connected disability means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16).
Passenger area means the area designed to seat the driver and passengers while a motor vehicle is in operation and any area that is readily accessible to the driver or a passenger while in his or her seating position, including but not limited to any type of glove or storage compartment accessible to passengers or driver.
Residential Floor Area means all of the square footage of living area within the perimeter of a residential structure, not including any carport, walkway, garage, overhang, patio, enclosed patio, or similar area. The determination of Residential Floor Area shall be made by reference to the building permit(s) issued for such Assessor’s Parcel.
Catastrophic illness or “injury” means an illness or injury that is expected to incapacitate the employee for an extended period of time, or that incapacitates a member of the employee’s family which incapacity requires the employee to take time off from work for an extended period of time to care for that family member, and taking extended time off work creates a financial hardship for the employee because he or she has exhausted all of his or her sick leave and other paid time off.
Major disaster means any flood, drought, fire, hurricane, earthquake, storm or other catastrophe which, in the determination of the governing body, is of sufficient severity and magnitude to warrant the use of available resources of the federal, state and local governments to alleviate the damage, hardship or suffering caused thereby.
Base flood means the flood having a one percent chance of being equaled or exceeded in any given year.
Flood-related erosion area management means the operation of an overall program of corrective and preventive measures for reducing flood-related erosion damage, including but not limited to emergency preparedness plans, flood-related erosion control works and floodplain management regulations.
Force Majeure Delays means any actual delay in the construction of the Tenant Improvements, which is beyond the reasonable control of Landlord or Tenant, as the case may be, as described in Paragraph 33 of the Lease.
ILUA Area means the geographical area in relation to which the Framework ILUA applies, as specified in Schedule 2 of the Framework ILUA;
Tenant Delays means delays caused by: (i) requirements of the Plans and Specifications requested by Tenant that do not conform to Landlord’s building standards for office and lab build-out, or which contain long lead-time or non-standard items requested by Tenant; provided that Landlord has notified Tenant of such deviations upon execution of this Lease (ii) any material change in the Plans and Specifications requested by Tenant and agreed to by Landlord; (iii) any request by Tenant for a delay in the commencement or completion of the Initial Tenant Improvements for any reason; (iv) Tenant delay in finalizing and approving the design of the vivarium and value engineering of same or (v) any other act or omission of Tenant or its employees, agents or contractors which reasonably inhibits the Landlord from timely completing the Initial Tenant Improvements including, without limitation any delays caused by Tenant’s presence in the Premises prior to the Term Commencement Date. The Premises shall not be deemed to be incomplete if only minor or insubstantial details of construction, decoration or mechanical adjustments remain to be done which do not unreasonably interfere with Tenant’s occupancy of the Premises. If as a result of Tenant Delays the Premises are deemed ready for Tenant’s occupancy, pursuant to the foregoing (and the term shall have commenced by reason thereof), but the Premises are not in fact actually ready for Tenant’s occupancy, Tenant shall not (except with Landlord’s consent not to be unreasonably withheld, conditioned or delayed) be entitled to take possession of the Premises for the permitted use until the Premises are in fact actually ready for such occupancy.
Natural Disaster means a flood, hurricane, tornado, earthquake, mudslide, tsunami, avalanche, landslide, volcanic eruption, fire, wildfire or blizzard that is due to natural causes.
Local Access Transport Area (LATA) is As Defined in the Act.
Total Floor Area means, the sum total of the total areas of all floors in a building or structure whether at above or below grade measured between the exterior faces of the exterior walls of the building or structure or from the centre line of a common wall separating two uses or from the outside edge of a floor where the outside edge of the floor does not meet an exterior or common wall, and;
Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.
Very high radiation area means an area, accessible to individuals, in which radiation levels from radiation sources external to the body could result in an individual receiving an absorbed dose in excess of 5 Gy (500 rad) in one hour at one meter from a source of radiation or one meter from any surface that the radiation penetrates.
Play area means an area of frequent soil contact by children of less than six years of age as indicated by, but not limited to, factors including the following: the presence of play equipment (sandboxes, swing sets, and sliding boards), toys, or other children’s possessions, observations of play patterns, or information provided by parents, residents, caregivers, or property owners.
Terminal disease means an incurable and irreversible disease that has been medically confirmed and will, within reasonable medical judgment, produce death within six months.
Communicable disease means an illness caused by an infectious agent or its toxins that occurs through the direct or indirect transmission of the infectious agent or its products from an infected individual or via an animal, vector or the inanimate environment to a susceptible animal or human host.
Optional Extended Local Calling Scope Arrangement Traffic is traffic that under an optional Extended Local Calling Scope Arrangement chosen by the Customer terminates outside of the Customer’s basic exchange serving area.
Auricular acupuncture means the subcutaneous insertion of sterile, disposable acupuncture needles
Business Area means an adjacent area that is zoned by a state, county, township, or municipal zoning authority for industrial or commercial purposes, customarily referred to as "b" or business, "c" or commercial, "i" or industrial, "m" or manufacturing, and "s" or service, and all other similar classifications and that is within a city, village, or charter township or is within 1 mile of the corporate limits of a city, village, or charter township or is beyond 1 mile of the corporate limits of a city, village, or charter township and contains 1 or more permanent structures devoted to the industrial or commercial purposes described in this subdivision and that extends along the highway a distance of 800 feet beyond each edge of the activity. Each side of the highway is considered separately in applying this definition except that where it is not topographically feasible for a sign or sign structure to be erected or maintained on the same side of the highway as the permanent structure devoted to industrial or commercial purposes, a business area may be established on the opposite side of a primary highway in an area zoned commercial or industrial or in an unzoned area with the approval of the state highway commission. A permanent structure devoted to industrial or commercial purposes does not result in the establishment of a business area on both sides of the highway. All measurements shall be from the outer edge of the regularly used building, parking lot, or storage or processing area of the commercial or industrial activity and not from the property lines of the activities and shall be along or parallel to the edge or pavement of the highway. Commercial or industrial purposes are those activities generally restricted to commercial or industrial zones in jurisdictions that have zoning. In addition, the following activities are not commercial or industrial:
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Usable Area or "usable square feet" shall be calculated by Landlord provided, however, that in any case the Rentable Area of the Building (and the applicable buildings of the Project) shall include all of, and, with respect to the Building, the Rentable Area of the Premises shall include a portion of, the square footage of the ground floor common areas located within the Building and the other applicable building(s) of the Project, respectively, and the common area and occupied space of the portion of the Project dedicated to the service of the Building or such other building(s) of the Project, as the case may be. "Common Areas" shall mean the lobby, plaza and sidewalk areas, accessways, Parking Facilities, and the area on individual floors in the Building or other building(s) of the Project, as applicable, whether indoor or outdoor, devoted to corridors, fire vestibules, elevators, foyers, lobbies, electric and telephone closets, restrooms, mechanical rooms, janitor's closets, and other similar facilities for the benefit of all tenants and invitees and shall also mean those areas of the Building or other building(s) of the Project, as applicable, devoted to mechanical and service rooms servicing the Building or other building(s) of the Project, as applicable. Tenant acknowledges that it has reviewed the detail of the Rentable Area and Usable Area of the Premises prior to execution of this Lease and understands and agrees to the methodology. The Common Areas shall be subject to the exclusive management and control of Landlord, and Tenant shall comply with all Rules and Regulations pertaining to the Common Areas. Landlord shall have the right from time to time to designate, and in its reasonable discretion, relocate and limit the use of particular areas or portions of the Common Areas; provided Landlord shall use commercially reasonable efforts to notify Tenant at least five (5) calendar days in advance of any such material relocation or limitation. Landlord shall also have the right, in its reasonable discretion, to close all or any portion of the Common Areas as may, in the reasonable discretion of Landlord, be necessary to prevent a dedication thereof or the accrual of any rights in any person, provided Landlord shall use commercially reasonable efforts to notify Tenant at least five (5) calendar days in advance of any such material closure. Notwithstanding anything to the contrary in this Section 2.01, any such relocation or limitation of use of any Common Areas shall not: (a) have a material adverse effect upon the access to and/or use by Tenant, or Tenant’s suppliers, employees, agents and customers (collectively, “Tenant’s Invitees”) of the Premises or vehicular and/or pedestrian access to the Premises, (b) be materially inconsistent with the rights and obligations of Landlord and Tenant under this Lease; and/or (c) materially increase Tenant’s cost of operating its business in the Premises. 4823-6605-5163.8 2 FLIGHT AT TUSTIN LEGACY ChromaDex
Urban growth areas means those areas designated
Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.