Erosion control project definition

Erosion control project means a project involving the
Erosion control project means a project involving the utilization of waste used tires for erosion control, bank stabilization or other conservation project;

Related to Erosion control project

  • Pollution control project means any activity or project at an existing electric utility steam generating unit for purposes of reducing emissions from such unit. Such activities or projects are limited to:

  • Emission control system means the electronic engine management controller and any emission related component in the exhaust or evaporative system which supplies an input to or receives an output from this controller.

  • Subprojects means more than one such Subproject.

  • Erosion and sediment control plan or "plan" means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Eligible Project Costs means such portion of the Project costs disbursed and loaned from the OPWC to the Recipient for the sole and express purpose of acquiring, constructing, reconstructing, expanding, improving, engineering and equipping the Project, other direct expenses, and related financing costs thereto.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Construction Contractor means a person who undertakes to or offers to undertake to, or purports to have the capacity to undertake to, or submits a bid to, or does himself or by or through others, construct, alter, repair, add to, subtract from, improve, move, wreck, or demolish any building, highway, road, railroad, excavation, or other structure, project, development, or improvement to real property, or to do any part thereof. "Construction contractor" includes subcontractors, specialty contractors, prime contractors, and any person receiving consideration for the general supervision and/or coordination of such a construction project except for remediation contracting. This definition shall govern without regard to whether or not the construction contractor is acting in fulfillment of a contract.

  • Tourism destination project means a qualified non-gaming business facility that will be among the most visited privately owned or operated tourism or recreation sites in the State, and which is located within the qualified incentive area and has been determined by the authority to be in an area appropriate for development and in need of economic development incentive assistance, including a non-gaming business within an established Tourism District with a significant impact on the economic viability of that District.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Subproject means a Subproject under the Project that meets the Subproject eligibility criteria set forth in paragraph 2 of Schedule 5 to this Loan Agreement;

  • Environmental and Social Impact Assessment or “ESIA” means a site-specific report, to be prepared in accordance with the parameters laid down in the ESMF (as hereinafter defined) and acceptable to the Association, identifying and assessing the potential environmental and social impacts of the activities to be undertaken for the Project, evaluating alternatives, and designing appropriate mitigation, management, and monitoring measures.

  • Total Project Costs means the total amount of money required to complete the Project.

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Construction Completion Date means date of the completion of the Construction Period, which shall be at the expiry of a period of 24 (Twenty Four) months from the Compliance Date or such other date (with the consent of the Authority) by which the overall development of the Project is completed in accordance with the provisions of this Concession Agreement and when the Construction Completion Certificate is issued by Authority as per Article 14.1.