Examples of Expected Term Year Energy Production in a sentence
Such certification must include all data relied on to support the revised Expected Term Year Energy Production.
The Performance Assurance Amount will be revised upon any change to the Expected Term Year Energy Production.
Subject to Section 3.07(c), Seller shall provide 30 days advance Notice to Buyer if there is any modification (other than a routine fluctuation in output or consumption) of the Generating Facility, the Site Host Load or operations related to the Site Host Load changing: Electric energy output by five percent of Expected Term Year Energy Production; or The type of Primary Fuel consumed by the Generating Facility.
The Expected Term Year Energy Production for each Term Year equals [ ] kWh. The Expected Term Year Energy Production may be revised in accordance with Section 3.07(c), or based on changes in the Site Host Load or the Site Host thermal requirements; provided, however that the Expected Term Year Energy Production may never exceed 131,400,000 kWh in any Term Year.
The Expected Term Year Energy Production for each Term Year equals [number of kWh] kWh. The Expected Term Year Energy Production may be revised based on changes in the Site Host Load or the Site Host thermal requirements; provided, however, that such revision must be supported by a certification from a California-licensed professional engineer qualified to make a representation affirming that such revision is reasonable and based on changes in the Site Host Load or the Site Host thermal requirements.
The Expected Term Year Energy Production for each Term Year equals [ ] kWh. The Expected Term Year Energy Production may be revised based on changes in the Site Host Load or the Site Host thermal requirements; provided, however, that such change must be supported by a certification from a California-licensed professional engineer qualified to make a representation affirming that such revision is reasonable and based on changes in the Site Host Load or the Site Host thermal requirements.
The Expected Term Year Energy Production for each Term Year equals [ ] kWh. The actual energy production of the Generating Facility may change from time to time; provided, however, that the Expected Term Year Energy Production may not exceed the As-Available Contract Capacity at 100% capacity factor applied over the Term Year.
Seller shall provide 30 days advance Notice to Buyer if there is any modification (other than a routine fluctuation in output or consumption) of the Generating Facility, the Site Host Load or operations related to the Site Host Load changing: Electric energy output by five percent of Expected Term Year Energy Production; or The type of Primary Fuel consumed by the Generating Facility.
The Expected Term Year Energy Production for each Term Year equals [___] kWh. The Expected Term Year Energy Production may be revised based on changes in the Site Host Load or the Site Host thermal requirements; provided, however, that such change must be supported by a certification from a California-licensed professional engineer qualified to make a representation affirming that such revision is reasonable and based on changes in the Site Host Load or the Site Host thermal requirements.
Seller shall provide thirty (30) days advance Notice to Buyer if there is any modification (other than a routine fluctuation in output or consumption) of the Generating Facility, the Site Host Load or operations related to the Site Host Load changing: Energy output by five percent of Expected Term Year Energy Production; or The type of Primary Fuel consumed by the Generating Facility.