Expected Term Year Energy Production definition

Expected Term Year Energy Production means the Metered Energy quantity expected to be produced by the Generating Facility during each Term Year, as set forth in Section 1.02(e).

Examples of Expected Term Year Energy Production in a sentence

  • Such certification must include all data relied on to support the revised Expected Term Year Energy Production.

  • The Performance Assurance Amount will be revised upon any change to the Expected Term Year Energy Production.

  • The Expected Term Year Energy Production for each Term Year equals [number of kWh] kWh. The Expected Term Year Energy Production may be revised based on changes in the Site Host Load or the Site Host thermal requirements; provided, however, that such revision must be supported by a certification from a California-licensed professional engineer qualified to make a representation affirming that such revision is reasonable and based on changes in the Site Host Load or the Site Host thermal requirements.

  • Subject to Section 3.07(c), Seller shall provide 30 days advance Notice to Buyer if there is any modification (other than a routine fluctuation in output or consumption) of the Generating Facility, the Site Host Load or operations related to the Site Host Load changing: Electric energy output by five percent of Expected Term Year Energy Production; or The type of Primary Fuel consumed by the Generating Facility.

  • The Expected Term Year Energy Production for each Term Year equals [ ] kWh. The Expected Term Year Energy Production may be revised based on changes in the Site Host Load or the Site Host thermal requirements; provided, however, that such change must be supported by a certification from a California-licensed professional engineer qualified to make a representation affirming that such revision is reasonable and based on changes in the Site Host Load or the Site Host thermal requirements.

  • The Expected Term Year Energy Production for each Term Year equals [ ] kWh. The actual energy production of the Generating Facility may change from time to time; provided, however, that the Expected Term Year Energy Production may not exceed the As-Available Contract Capacity at 100% capacity factor applied over the Term Year.

  • The Expected Term Year Energy Production for each Term Year equals [ ] kWh. The Expected Term Year Energy Production may be revised in accordance with Section 3.07(c), or based on changes in the Site Host Load or the Site Host thermal requirements; provided, however that the Expected Term Year Energy Production may never exceed 131,400,000 kWh in any Term Year.

  • The Expected Term Year Energy Production for each Term Year equals [___] kWh. The Expected Term Year Energy Production may be revised based on changes in the Site Host Load or the Site Host thermal requirements; provided, however, that such change must be supported by a certification from a California-licensed professional engineer qualified to make a representation affirming that such revision is reasonable and based on changes in the Site Host Load or the Site Host thermal requirements.

  • Seller shall provide 30 days advance Notice to Buyer if there is any modification (other than a routine fluctuation in output or consumption) of the Generating Facility, the Site Host Load or operations related to the Site Host Load changing: Electric energy output by five percent of Expected Term Year Energy Production; or The type of Primary Fuel consumed by the Generating Facility.

  • Seller shall provide thirty (30) days advance Notice to Buyer if there is any modification (other than a routine fluctuation in output or consumption) of the Generating Facility, the Site Host Load or operations related to the Site Host Load changing: Energy output by five percent (5%) of Expected Term Year Energy Production; or, The type of Primary Fuel consumed by the Generating Facility.

Related to Expected Term Year Energy Production

  • Gas Year means the period of 365 or 366 Gas Days, as the case may be, beginning at October 1st at 06:00 hours (Belgian time) and ending at September 30th 06:00 hours (Belgian time) of the next year.

  • Energy year or "EY" means the 12-month period from June 1st

  • Short-Term Resource Procurement Target means, for Delivery Years through May 31, 2018, as to the PJM Region, for purposes of the Base Residual Auction, 2.5% of the PJM Region Reliability Requirement determined for such Base Residual Auction, for purposes of the First Incremental Auction, 2% of the of the PJM Region Reliability Requirement as calculated at the time of the Base Residual Auction; and, for purposes of the Second Incremental Auction, 1.5% of the of the PJM Region Reliability Requirement as calculated at the time of the Base Residual Auction; and, as to any Zone, an allocation of the PJM Region Short-Term Resource Procurement Target based on the Preliminary Zonal Forecast Peak Load, reduced by the amount of load served under the FRR Alternative. For any LDA, the LDA Short-Term Resource Procurement Target shall be the sum of the Short-Term Resource Procurement Targets of all Zones in the LDA.

  • Projected actual emissions means the maximum annual rate, in tons per year, at which an existing emissions unit is projected to emit a regulated NSR pollutant in any one of the 5 years (12-month period) following the date the unit resumes regular operation after the project, or in any one of the 10 years following that date, if the project involves increasing the emissions unit’s design capacity or its potential to emit that regulated NSR pollutant, and full utilization of the unit would result in a significant emissions increase, or a significant net emissions increase at the major stationary source.

  • Adjusted Term SOFR means, for purposes of any calculation, the rate per annum equal to (a) Term SOFR for such calculation plus (b) the Term SOFR Adjustment; provided that if Adjusted Term SOFR as so determined shall ever be less than the Floor, then Adjusted Term SOFR shall be deemed to be the Floor.

  • Supply Period means the period commencing on the Supply Period Start Date and terminating on the Termination Date.

  • PJM Region Peak Load Forecast means the peak load forecast used by the Office of the Interconnection in determining the PJM Region Reliability Requirement, and shall be determined on both a preliminary and final basis as set forth in Tariff, Attachment DD, section 5.

  • Basic gas supply service means gas supply service that is

  • Electric generation service means the provision of retail

  • Basic generation service or "BGS" means electric generation

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per million.

  • Contract Term Adjustment means adjustment only as provided for in the three circumstances described in this Subsection. Under these circumstances, the contract term shall be adjusted in writing to include additional calendar days in one or more Normal Operating Seasons equal to the actual time lost, except as limited by paragraph (b) in this Subsection.

  • Competitive integrated employment means work (including self-employment) that is performed on a full-time or part-time basis:

  • Net energy metering means measuring the difference, over the net metering period, between (i)

  • Three-Month Term SOFR means the rate for Term SOFR for a tenor of three months that is published by the Term SOFR Administrator at the Reference Time for any Floating Interest Period, as determined by the Calculation Agent after giving effect to the Three-Month Term SOFR Conventions.

  • Production, Use or Storage of Nuclear Material means the production, manufacture, enrichment, conditioning, processing, reprocessing, use, storage, handling and disposal of Nuclear Material.

  • Adjusted Term SOFR Rate means, for any Interest Period, an interest rate per annum equal to (a) the Term SOFR Rate for such Interest Period, plus (b) 0.10%; provided that if the Adjusted Term SOFR Rate as so determined would be less than the Floor, such rate shall be deemed to be equal to the Floor for the purposes of this Agreement.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Day-ahead System Energy Price means the System Energy Price resulting from the Day- ahead Energy Market.

  • Useful thermal energy means, with regard to a cogeneration unit, thermal energy that is:

  • Net metering period means the 12-month period following the date of final interconnection of the

  • Planned Service Interruption means a Service Interruption that has been scheduled to occur in accordance with Schedule 5;

  • Market Measure Business Day means a day on which:

  • Generation Service means the sale of electricity, including ancillary services such as the provision of reserves, to a Customer by a Competitive Supplier.

  • Nominated Energy Efficiency Value means the amount of load reduction that an Energy Efficiency Resource commits to provide through installation of more efficient devices or equipment or implementation of more efficient processes or systems.

  • Natural Gas Liquids means those hydrocarbon components that can be recovered from natural gas as a liquid including, but not limited to, ethane, propane, butanes, pentanes plus, and condensates;